An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Diagnostics/Common Optics: Priorities, Engineering Facility Advisory Committee Breakout Session 3 – X-Ray Systems, Including LUSI November 11-13 2008 Yiping Feng – Instrument Scientist Eliazar Ortiz – Lead Engineer Marc Campell – Mechanical Engineer Tim Montagne – Mechanical Engineer Rick Jackson – Design Engineer Don Arnett – Designer Ben Bigornia – Designer Joseph Stieber- Designer

  2. Outline • Distribution • Profile, Intensity, Intensity-Position Monitor • Slits • Pulse Picker • Attenuator

  3. Components Distribution • Components locations • Distributed throughout the XPP, CXI, and XCS instruments, including X-ray transport tunnel HEDS CXI Endstation X-ray Transport Tunnel XCS Endstation Near Experimental Hall XPP Endstation Far Experimental Hall LCLS X-ray FEL SXR AMO

  4. Components Distribution (cont.)

  5. Optical pixelated detector Optical zoom lens 45º mirror Scintillator Profile Monitor • Purpose: • Coarse beam alignment/monitoring; Coarse/fine beam profile • Specifications: • Destructive; Retractable • At 100 mm resolution - 24x24 mm2 field of view; • At 8 mm resolution - 2x2 mm2 field of view • Capable of per-pulse op. @ 120 Hz • Mechanical Requirements

  6. Profile Monitor • Challenges • Design continuity • Space Constraints • Commonality • Chamber • Stands • Stages • Solutions • Permanent staffing commitments • Combine IM/PM • Common mount for all monitor sensors • Concepts based on proven designs • Similarity to LCLS wire scanner

  7. Profile Monitor • Next Steps • Update Spec. Documentation -Nov 08 • PDR PM and Supports -Nov 08 • Finalize Design PM -Dec08 • Finalize Support Design -Dec08 • FDR PM & Supports -Feb 09 • Drawings -May 09

  8. Intensity Monitor • Purpose: • Coarse beam alignment/monitoring; Simple point detector • Specifications: • Destructive; Retractable • Relative accuracy < 1% • Dynamic range 100 • Capable of per-pulse op. @ 120 Hz • Mechanical Requirements

  9. Intensity Monitor • Challenges • Design continuity • Commonality • Chamber • Stands • Stages • Solutions • Permanent staffing commitments • Common mount for all monitor sensors • Concepts based on proven designs • Similarity to LCLS wire scanner

  10. Intensity Monitor • Next Steps • Update Spec. Documentation -Nov 08 • PDR IM and Supports -Nov 08 • Finalize Design IM -Dec 08 • Finalize Support Design -Dec08 • FDR IM & Supports -April 09 • Drawings -Aug 09

  11. Intensity-Position Monitor • Purpose: • Per-pulse normalization of experimental signals • High-resolution beam position monitoring • Specifications: • Highly transmissive (< 5% loss) • Relative accuracy < 0.1% • Dynamic range 1000 • Per-pulse op. at 120 Hz • Mechanical Requirements

  12. Intensity-Position Monitor • Challenges • Design continuity • Space Constraints • Commonality • Chamber • Stands • Stages • Solutions • Permanent staffing commitments • Common shaft mount for all monitor sensors • Concepts based on proven designs • Similarity to LCLS wire scanner

  13. Intensity-Position Monitor • Next Steps • Update Spec. Documentation -Nov 08 • PDR PM and Supports -Nov 08 • Finalize Design PM –Dec 08 • Finalize Support Design–Dec 08 • FDR PM & Supports - Jan 09 • Drawings -March 09

  14. Pink beam Low-Z High-Z Mono beam D=3 mm High-Z Slits • Purpose: • Defines the beam size & position • Clean up scatterings (halo) around beam perimeter • Specifications: • Can withstand full LCLS flux – unfocused • Minimize background scatter from blades • Mechanical Requirements

  15. Slits • Solutions • Available commercial products that would meet specifications with minor modifications. • Commercial product meets envelope requirements • Inspection reports have been requested from vendor on latest batch • Slit loaner has been requested from vendor for in-house evaluation • Inquired references from vendor and other labs about their experience with ADC’s slits. • Challenges • Precise Motion • Space Constraints • Vendor performance capabilities have been put into question

  16. Pink beam Low-Z High-Z Mono beam D=3 mm High-Z Slits • Next Steps • Update Spec. Documentation -Nov 08 • PDR -Nov 08 • Finalize Design –Dec 08 • FDR PM & Supports - Jan 09 • Inspect loaned unit –Feb 09 • Drawings -March 09

  17. Pulse Picker Design • Purposes • Select a single pulse or any sequence of pulses • Reduce LCLS repetition rate to < 10 Hz • Specifications • < 3 ms switching time • < 8 ms in close/open cycle time • Only for < 10 Hz operation • Withstand full LCLS flux • Implementation • Based on a commercial mechanical teeter-totter* • Steel blade fully stops beam • Si3N4 required to protect the steel blade • Capable of ms transient time Requires 100 mm • Mechanical Requirements Si3N4 coating on blade to reduce damage * http://www.azsol.ch/

  18. Pulse Picker • Solutions • Brazing schemes under study • Combined attenuator with Pulse picker device • Challenges • Blade Coating • Space Constraints • X < 300 mm • Minimize Z length

  19. Pulse Picker • Next Steps • Update Spec. Documentation -Nov 08 • PDR PP and Supports -Nov 08 • Finalize Design PP –Dec 08 • Finalize Support Design–Dec 08 • FDR PP & Supports - Jan 09 • Drawings -March 09

  20. Attenuator System • Attenuator Purpose • Reduce incident X-ray flux • Sample damage • Detector saturation • Diagnostic saturation • Alignment of optics and diagnostics • Attenuator Specifications • Minimize wavefront distortion and coherence degradation • Withstand unfocused flux • 108 attenuation at 8.3 keV • 105 attenuation at 24.9 keV • 3 steps per decade • Mechanical Requirements

  21. Attenuator System • Solutions • Use of actuators with stepper motors • Actuators meets envelope requirements • Reduce number of view ports • Combined attenuator with Pulse picker device • Challenges • Avoid pneumatic actuators • Space Constraints • X < 300 mm • Minimize Z length

  22. Attenuator System • Next Steps • Update Spec. Documentation -Nov 08 • PDR Attn. and Supports -Nov 08 • Finalize Design Attn –Dec 08 • Finalize Support Design–Dec 08 • FDR Attn & Supports - Jan 09 • Drawings -March 09

  23. Summary • Designs are progressing • Challenges have emerged • Vendor reputation • Space constraints in X and Z • Steps are being taken to overcome challenges