Conclusions. Three Design Tasks Completed. Optimal locations of the inspection and overpacking cell(s). Overpacking Cell considerations. Inspection Cell considerations. Results presented as recommendations. 1. Locations. One centrally located Overpacking Cell.
E N D
Conclusions Three Design Tasks Completed. • Optimal locations of the inspection and overpacking cell(s). • Overpacking Cell considerations. • Inspection Cell considerations. Results presented as recommendations.
1. Locations • One centrally located Overpacking Cell. • Eleven Inspection Cells, one on the ground floor at the front of each vault. • The inclusion of an extra transfer tunnel is recommended, along side the existing tunnel.
2. Overpacking Cell • The Overpacking Cell should only overpack packages. • Layout Design A has been chosen.
3. Inspection Cell • Inspection Scheme 2.
3. Inspection Cell • Inspection Cell Layout C2.