1 / 6

Conclusions

Conclusions. Three Design Tasks Completed. Optimal locations of the inspection and overpacking cell(s). Overpacking Cell considerations. Inspection Cell considerations. Results presented as recommendations. 1. Locations. One centrally located Overpacking Cell.

andrewse
Download Presentation

Conclusions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Conclusions Three Design Tasks Completed. • Optimal locations of the inspection and overpacking cell(s). • Overpacking Cell considerations. • Inspection Cell considerations. Results presented as recommendations.

  2. 1. Locations • One centrally located Overpacking Cell. • Eleven Inspection Cells, one on the ground floor at the front of each vault. • The inclusion of an extra transfer tunnel is recommended, along side the existing tunnel.

  3. 1. Locations

  4. 2. Overpacking Cell • The Overpacking Cell should only overpack packages. • Layout Design A has been chosen.

  5. 3. Inspection Cell • Inspection Scheme 2.

  6. 3. Inspection Cell • Inspection Cell Layout C2.

More Related