E N D
1. Preparing an SBIR Cost Proposal How in the world is the cost proposal developed?
2. Basic Elements of an SBIR Cost Proposal
3. Direct Materials
4. Direct Labor
5. Overhead Rate
6. Indirect Costs
7. Indirect Costs (continued)
8. I don’t have an Indirect Rate
9. Other Direct Costs
10. General and Administrative Rate (G&A)
11. Profit or Fee
12. General Rules and Guidelines
13. Unallowable Costs
14. Travel
15. Developing an Adequate Accounting System
16. Types of Contracts
17. Main characteristics of a FFP contract are:
18. Main characteristics of a CPFF contract are:
19. Main characteristics of a CPFF contract: (continued)