National renewable energy policy – results and challenges Estonia. 19.02.2013. Madis Laaniste, Energy Department. Targets of renewable energy policy. national long-term energy strategy (Parliament 2009) target for renewables – 25% from gross final energy consumption in 2020

anevay
Download Presentation

National renewable energy policy – results and challenges Estonia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National renewable energy policy – results and challengesEstonia 19.02.2013 Madis Laaniste, Energy Department

  2. Targets of renewable energy policy • national long-term energy strategy (Parliament 2009) • target for renewables – 25% from gross final energy consumption in 2020 • target for transport – 10% from renewables in 2020

  3. Total share of RES

  4. Total share of RES in transport

  5. The role of RE • The share of renewable energy in Total Primary Energy Supply is 15%, ca 60% of the primary energy supply comes from oil shale • Bioenergy has the biggest share in RE – ca 85%, 15% are coming from other resources (mainly wind, installed capacity ca 200 MW)

  6. Main measures to promote energy generation from RES • Premium tariff support scheme for RES-E • large biomass CHPs • co-firing of biomass in oil shale power plants • wind energy • Investment support schemes for RES-E and RES-H • for installation of wind energy capacities (22 MW); • for small CHPs (biogas, biomass) and boilerhouses using fossil fuels

  7. Issues around RE and regional development • Noticeable share of energy costs that consumers pay, go to RE producers – little acceptance to go beyond adopted RE targets • Rural regions lose their competitive advantages, partly due to higher energy costs than in urban areas • New development options can be created, if agricultural waste and residues will be taken into use in biogas production with a view to achieve the RE target in transport sector

  8. The actions by the government • Reduce energy costs through optimisation of heat supply • upgrade existing DH systems if its economically justified • solutions based on RE are preferred • improve energy efficiency, particularly in residential and public buildings

  9. The actions by the government • Setting up a programme for biogas use in transport sector • Set up biogas production infrastructure • Discussion, how to promote fleet increase: subsidy for car purchase or excise policy favouring natural gas or biogas use in transport sector • Support relevant R&D activities

  10. Thank you!