An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. potential • Add freq duration curve of both CG and SR on same scale say any month or preferably an year to show the further potential

  2. Weekly gains from wr • A graph of weekly gains from sr-wr ire as per rea • Simmilar for er

  3. SPECIAL TCC MEETING ON 23-AUG-04 CONSUMPTION PLOT 2002 - 05 LOAD RESTRICTION VARIABLE COST UI SUMMARY TILL 25/JULY/04 UI IN SR IRE-ACCOUNT ANTICIPATED DEMAND POSITION ANTICIPATED ENERGY POSITION LETTERS UI ADVANTAGES BENEFIT OF WR UI HVDC UTILISATION UI OF ER & WR AND TOTAL UI SCH Vs DRAWAL ER SCH Vs DRAWAL WR SCH Vs DRAWAL TALCHER II BENEFIT OF ER UI UI OF ER & CONSTITUENTS INTER REGIONAL ARBITRAGE SUGGESTION ECONOMIC SURVEY EXTRACTS 9.14 DRAWAL PATTERN OF STATES SKEWED DRAWAL PAYABLES AND RECEIVABLES

  4. LOAD RESTRICTION • RESTRICTION LIFTED IN KARNATAKA FROM 18-JUNE-04. • CYCLIC PEAK LOAD SHEDDING WITHDRAWN FROM 16-JUNE-04. IN KERLA • ANDHRA PRADESH HAVE REMOVED LOAD RESTRICTION • NO SHEDDING IN TAMIL NADU

  5. MAXIMUM & MINIMUM DRAWAL JULY-04

  6. SUMMARY OF UI – 84 WKS(FROM 01/JAN/03 TO 08/AUG/04)

  7. INTER REGIONAL UI IN SR (FROM 01/01/03 TO 08/08/04) • TOTAL UI TURNOVER :- 4831 MU • TOTAL UI AMOUNT DISBURSED:- 917 CR • INTER REGIONAL UI:- +942 MU (-)191 MU • AVG WEEKLY TRANSACTION:- 57 MU • AVG WEEKLY UI AMT DISBURSED:- 11 CR • AVG RATE OF UI WITH WR IN PS/U • 155 PS/U @SR • 255 PS/U @WR • AVG RATE OF UI IMPORT FROM ER IN PS/U • 144 PS/U @ ER

  8. INTER-REGIONAL EXCHANGES A/C DETAILS UPTO 84 WKS (TILL 08/08/04) • SR IMPORTED 295 MU AND EXPORTED 181 MU TO WR. • AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 36.5Crs • AMOUNT TO BE ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 23.25Crs • AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 29.83Crs • AMOUNT ALREADY DISBURSED TO SR CONSTITUENTS = 27.36Crs • BALANCE DUE TO SR CONSTITUENTS = 2.5Crs

  9. LETTERS EREB 06-MAY-04 SREB 28-OCT-03 SREB 21-NOV-03 SREB 12-MAY-04 EREB 28-MAY-05 SREB 07-JUNE-04 TNEB 12-AUGUST-04

  10. SOUTHERN REGION - ANTICIPATED DEMAND POSITION ANTICIPATED DEMAND POSITION DEMAND DEFICIT/SURPLUS IN %

  11. SOUTHERN REGION - ANTICIPATED ENERGY POSITION ANTICIPATED ENERGY POSITION ENERGY DEFICIT/SURPLUS IN %

  12. HVDC SET POINT CHANGES ABOUT 50 SET POINT CHANGES IN A DAY TALCHER GAZUWAKA BHADRAWATHI

  13. ADVANTAGESINTER-REGIONAL UI • WIN – WIN PLATFORM – PROMOTES TRADE • SPOT MARKET IN REAL TIME • REDUCES THE NEED FOR BILATERAL • BEST UTILISATION OF FLEXIBLE HYDRO • COSTLIER GENERATORS IN SR • CHEAPER PIT-HEAD STATIONS IN ER • SR IS ENERGY DEFICIT • ER IS ENERGY SURPLUS • SHORTAGE OF COAL / LIGNITE IN SR • IMPACT ON ENVIROMENT • REPLACE COSTLY GENERATION BY CHEAPER GENERATION • ULTIMATE ECONOMISATION

  14. ER –SR LINK PRESENT • 500 MW GAJUWAKA HVDC B2B • 2000 MW TALCHER-KOLAR HVDC FUTURE • ANOTHER 500 MW HVDC B2B AT GAJUWAKA BY DECEMBER 2004 • ENHANCEMENT OF TALCHER-KOLAR HVDC TO 2500 MW BY NEXT YEAR DIAGRAM

  15. 3500 MW TRANSFER CAPABILITY ON HVDC.ANOTHER 500 MW POLE TO BE ADDED AT GZK. TALCHER POLE CAPABILITY TO BE ENHANCED TO 2500 MW GRID MAP TALCHER BHADRAVATI JEYPORE 178x2 SIMHADRI NTPC 2x221 8x4 RSTPP GAZUWAKA(AP) 1 301x2 189 15x2 P 187 195 VISAKHAPATNAM (POWERGRID) 267x2 KHAMMAM HYDERABAD 317 P P 115 197x2 P MMDP 155 P VIJAYAWADA 146x2 221x2 258 RAICHUR NAGARJUNASAGAR P Nagjhari 279 172 308 SSLMM MUNIRABAD P KODASAALY 277 52x2 KURNOOL KAIGA SIRSI 120 P N GOOTY CUDDAPAH 60 P DAVANAGERE 300 NELLORE 173 302 400 KV LINE PRESENTLY OPERATED AT 220 KV KADRA HIRIYUR 330 242 28 NELAMANGALA ALMATHI BANGALORE P MADRAS P KOLAR HOODY TALGUPPA HOSUR MAPS 182 181 63 175 PONDICHERY SALEM 54 P NEYVELI 179 151 164x2 UDUMALPET TRICHY P 130x2 TRICHUR P P 127 130x2 P MADURAI ABOUT 38000 CKM OF 400/220 KV TRANSMISSION PALLOM KAYANKULAM EDAMON 2x78 THIRUVANATHAPURAM

  16. SCHEDULING AND METERING POINTS OF ER – SR UI TALCHER STAGE2 ER TALCHER SCHEDULING & METERING POINT EAST BUS ER INTERCONNECTOR TALCHER HVDC GAJUWAKA HVDC SOUTH BUS SR

  17. UI ON ER –SR LINK • FLEXIBILITY TO THE SYSTEM OPERATOR • MERIT ORDER • OPTIMISATION OPPORTUNITY • LOSS REDUCTION • DE-CONGESTION OF NETWORK • RAIPUR-ROURKELA IN ER • BHILAI-KORADI IN WR • CUDAPAH-KOLAR, NUNNA-NELLORE IN SR • VOLTAGE CONTROL • FGMO – MORE CONDUCIVE

  18. PRESENT ER –SR UI • ER UI IS CALCULATED BASED ON THE ER FREQUENCY • ONLY ONE SIDE FREQUNCY IS USED • NO SHARING OF BENEFIT BY THE EXPORTING ER REGION • UNLIKE PRACTICE IN OTHER REGIONAL LINKS

  19. PRESENT ER –SR UI DIFFERNCES BETWEEN ER-SR LINK AND OTHER INTER REGIONAL LINKS • TALCHER STAGE2 BELONGING TO SR IS PRESENT IN ER • TALCHER – KOLAR HVDC LINE IS PART OF SR TRANSMISSION SYSTEM • LOSS AND TRANSMISSION CHARGES OF TALCHER KOLAR LINE IS BORNE BY SR.

  20. GLORIOUS CASES (01-04-03 TO 08-08-04) DATE UI FROM ER INMW 21-09-2003 980 25-09-2003 1060 19-05-04 1100 9.1MUs AVAILED FROM ER/WR UNDER UI ON 31/AUGUST/03 ------850MW.

  21. SECURITY INADDITION TO THE ECONOMICS, THE SECURITY OF THE GRID IS ENHANCED BY INTER REGIONAL UI • DURING CRISIS BOTH THE REGIONS EXCHANGE THE UI POWER WHICH RESULT IN BETTER SECURITY OF BOTH THE GRIDS

  22. SUGGESTION • WHILE ARRIVING THE RATIO FOR SHARING THE BENEFIT THE FOLLOWING HAS TO CONSIDERED • CHANGING OF SCHEDULING/METERING POINT • TALCHER –KOLAR LINE LOSS • TRANSMISSION CHARGES OF TALCHER – KOLAR LINE

  23. SUGGESTION • INSTEAD OF INTERCONNECTOR OF TALCHER 1 & 2 , TALCHER HVDC CAN BE MADE SCHEDULING AND METERING POINT. • TALCHER STAGE 2 WILL BE IN THE ER POOL FOR UI ACCOUNT.

  24. TOTAL PAYABLES AND RECEIVABLES (01-04-03 TO 08-08-04) • TOTAL PAYABLES Rs. 876.21 Crores • TOTAL RECEIVABLES Rs.824.78 Crores • SAVINGS DUE TO ER UI GOES TO ONLY OVER DRWAING CONSTITUENTS. PAYABLES AND RECEIVABLES

  25. HIGHLIGHTS OF UI TRANSACTION ON 31.08.03 (SUNDAY, GANESH CHATURTHI) • UI imported from ER : 6.07 MU • UI imported from WR : 2.81 MU • Total UI imported from C. Grid by SR : 8.88 MU • Average UI rate of C.Grid : 93 Ps/Unit • Average UI rate in SR for C.Grid : 213 Ps/Unit • Max. Power transfer in UI from ER : 510 MW • Max. Power transfer in UI from WR : 350 MW • Total Max. Power transfer in UI from C.Grid: 860 MW • Amount saved for the SR constituents : 107 Lacs • Total Number of HVDC Operations : 50 no.s NEXT

  26. OPERATION ON 31/08/03

  27. INTER-REGIONAL ARBITRAGEHOW IT WORKS FREQ = 50.2 HZ/ RS 0.70 WESTER REGION GRID EASTER REGION GRID SOUTHERN REGION GRID DIFFERENCE IS RS 1.50 SIGNAL:- DRAW POWER FROM CENTRAL GRID FREQ = 49.6 HZ/ RS 2.20

  28. HOW ARBITRAGE HEELPS • TAKES CARE OF EXIGENCIES • LOW FREQUENCY • HIGH FREQUENCY • KEEPS PRICE/FREQ MOVING IN A NARROW BAND • HELPS CONTROL CONGESTION • DECREASE LOSSES • MERIT ORDER OPERATION IN BOTH REGIONS EXTRACTS FROM NEMMCO