Photographs on the progress of the project

Brand new Pedrollo Sumo 2/7 electric submersible pump delivered to the construction site of the water supply system for the school. Installing the submersible pump into the well to facilitate dewatering of the well in order to ease the construction of the wall lining in the water logged section.

angie
Download Presentation

Photographs on the progress of the project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brand new Pedrollo Sumo 2/7 electric submersible pump delivered to the construction site of the water supply system for the school.

  2. Installing the submersible pump into the well to facilitate dewatering of the well in order to ease the construction of the wall lining in the water logged section.

  3. Pupils of Good Samaritan Integrated Nursery and Primary School fetching water during the dewatering exercise of the deep well to facilitate the construction activities below water table

  4. Pupils of Good Samaritan Integrated Nursery and Primary School fetching water during the dewatering exercise of the deep well to facilitate the construction activities below water table