Brand new Pedrollo Sumo 2/7 electric submersible pump delivered to the construction site of the water supply system for the school. Installing the submersible pump into the well to facilitate dewatering of the well in order to ease the construction of the wall lining in the water logged section.
E N D
Brand new Pedrollo Sumo 2/7 electric submersible pump delivered to the construction site of the water supply system for the school.
Installing the submersible pump into the well to facilitate dewatering of the well in order to ease the construction of the wall lining in the water logged section.
Pupils of Good Samaritan Integrated Nursery and Primary School fetching water during the dewatering exercise of the deep well to facilitate the construction activities below water table
Pupils of Good Samaritan Integrated Nursery and Primary School fetching water during the dewatering exercise of the deep well to facilitate the construction activities below water table