10 likes | 273 Views
BLACK START PROCEDURES:REVIEW OF STARTUP POWER TO NTPC,RGM. WHY ISLANDING OF NTPC UNITS WITH A RADIAL LOAD IS NOT PREFERABLE. NTPC UNITS ARE NOT ON FREE GOVERNOR MODE. AS FAULT LEVEL OF THE BUS IS VERY LOW LARGE VOLTAGE FLUCTUATIONS ARE LIKELY.
E N D
BLACK START PROCEDURES:REVIEW OF STARTUP POWER TO NTPC,RGM. WHY ISLANDING OF NTPC UNITS WITH A RADIAL LOAD IS NOT PREFERABLE • NTPC UNITS ARE NOT ON FREE GOVERNOR MODE. • AS FAULT LEVEL OF THE BUS IS VERY LOW LARGE VOLTAGE FLUCTUATIONS ARE LIKELY. • FREQUENCY CANNOT BE CONTROLLED IN AN ACCEPTABLE BANDWIDTH DUE TO LOW POWER NUMBER IN THE SYSTEM. • PHASE IMBALANCES,ESP.DUE TO TRACTION LOADS MAY CAUSE SECONDARY COLLAPSE IN THE ISLAND.