1 / 16

swisstopo (LPT) Report 2006/2007

swisstopo (LPT) Report 2006/2007. E. Brockmann. EUREF – EUMETNET MoU. Signed at EUREF06 in London Good bases for further collaboration between E-GVAP and EUREF. Monitoring NRT solutions. Only graphical adaptations to new corporate design New internet system planned till end of the year.

anja
Download Presentation

swisstopo (LPT) Report 2006/2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. swisstopo (LPT) Report 2006/2007 E. Brockmann

  2. EUREF – EUMETNET MoU • Signed at EUREF06 in London • Good bases for further collaboration between E-GVAP and EUREF

  3. Monitoring NRT solutions • Only graphical adaptations to new corporate design • New internet system planned till end of the year

  4. Processing • Bernese Software 5.0 (+) • ~ same number of stations • Absolute antenna model since GPS week 1401 (Nov. 2006) • GNSS PP analyses (GLONASS ambiguities float) since week 1401 • GNSS enhancement of AGNES in June/July 2007: 2/3 of the stations with GNSS receivers equipped • GNSS NRT analyses(GLONASS ambiguities fixed) since 2 weeks

  5. Station PAYE (first GNSS update) Stefan Schaer Daniel Ineichen Elmar Brockmann June 14, 2007

  6. Optimised baseline selection strategy MAX-OBS-> MAX-OBS / SHORTEST / GNSS Baselines (not yet included: Receiver Type)

  7. GPS Aug 2007 DOY 2007

  8. GPS + GLONASS Aug 2007 DOY 2007

  9. GPS + GLONASS Aug 2007 DOY 2007

  10. Validation Postprocessing – NRT – RRT Reference: PP Rel.-Cal. PP Abs.-Cal. + GNSS NRT Abs.-Cal. GNSS

  11. Influence Antenna ModelRel. PCV -> abs. PCV

  12. EPN Tropo combination Refined processing options.

  13. Summary • Absolute antenna phase center model used since GPSWeek 1400 (Nov. 2006) for NRT and PP. Influence is 4-12 mm dependent of antenna type on the station • GNSS processing (ambiguity float) introduced in postprocessed solutions since GPSWeek 1401. The influence on ZTD is very small. • 2/3 of the AGNES sites with GNSS receivers • New baseline strategy (shorter baselines) is a prerequisite for GNSS ambiguity resolution. • GNSS ambiguity fixed solutions since 2 weeks. Influence on NRT need to be validated.

  14. Action Items • Installation of remaining 10 AGNES sites: GPS -> GNSS (double station concept) • Ambiguity resolution GNSS for longer baselines and for mixed receivers including proper inter-phase bias handling (-> hope to realize improvements for NRT ZTD + GNSS-tomography) • More “Super Sites” in LPT processing

  15. Validation: Reference PP GNSS ABS-CAL PP Abs.-Cal. + GNSS

More Related