1 / 9

NHMFL-PFF Strategic Plans: Achieving 100 T

NHMFL-PFF Strategic Plans: Achieving 100 T . Chuck Mielke Director of the NHMFL-PFF. Where are we today. 85 T Operations user program World Leading and Unique User Environment Currently executing our second call of proposals Set World Record for non-destructive high field (89 Tesla)

anka
Download Presentation

NHMFL-PFF Strategic Plans: Achieving 100 T

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NHMFL-PFF Strategic Plans: Achieving 100 T Chuck Mielke Director of the NHMFL-PFF

  2. Where are we today • 85 T Operations user program • World Leading and Unique User Environment • Currently executing our second call of proposals • Set World Record for non-destructive high field (89 Tesla) • Have the Worlds largest (electrical) Pulsed Power System • 1.4 GVA Has Enabled the Only Reliable Fields > 80T • +600 MJ pulse capacity • use 140 MJ for the 85 T magnet outsert • Have established a world leading competency in Fermi Surface Topology using all NHMFL magnets (especially the 85 T)

  3. Where are we going? • 100 T • (Operational System Verification) • Acceptable risk field for user operations • Based on analysis of mechanics at peak field. (Primarily determined by outsert) • 100 T user operations

  4. How? • By reducing bore from 15 to 10 mm • Insert delivers 61.3 T by itself • Outsert delivers (37.0 – 3.3) T = 33.7 T • Same risk to outsert as current 85 T operations • To reach 100 T outsert must deliver 5 T more • Assess risk of 42 T outsert field

  5. When? (Major Milestones) • 10 mm Insert Cad Design (Done Aug 2011) • 42T outsert Eng. Risk Assessment Nov 30th 2010 • 10 mm insert completed by Jan 30th 2011 • Test to 95 T or higher (Mar – Apr 2011) • 100 T user operations analysis (June 2011) • Upgrade for 100 T user ops … (2012 – 2014) • Upgraded outsert and spares (coils 1-4 of the outsert)

  6. Timeline details Scientist Hire EE Hire 2010 2011 Nov Sep Jan Mar-Apr Jul 2006 2007 2008 2009 June Oct Aug 2012 - 2014 Feb Dec Test to 95 T + 100T Ops Analysis 100 T User Ops Commissioned to 89 T ERA for 42T Outsert Ops 10 mm Tooling Complete Install & Hi-Pot 10 mm Assembly 10 mm Assembly Complete Second Call User ops to 85 T First Call User ops to 85 T 10 mm Tooling Design Complete Repaired Coils 2 & 3 on Outsert ARRA Project Completed

  7. 100T Users Call #1 HTC Contactless Conductivity Sebastian et al. PNAS Micro-cantilever magnetometry Quantum Oscillations in doped pnictides HTC Contactless Conductivity Singleton et al. PRL Transport in pnictide superconductor measurement of upper critical fields dHvA & contactless conductivity [U-based heavy fermions] Micro-cantilever magnetometry [quantum magnets] Magneto-transport measurements LSCO Quantum Oscillations Micro-cantilever magnetometry & contactless conductivity [Hg high-Tc]

  8. Performance of 100T Magnet Systems

More Related