1 / 13

SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete

ISO/IEC JTC1/SC32/WG2 N1599. SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete. Baba Piprani/Canada SC38 SC32 Liaison. Past meeting…. 4th meeting of JTC1/SC38 was held in Seoul, Korea 19-23 September , 2011 Participating Countries:

ankti
Download Presentation

SC38 Liaison Report to SC32 at SC32 meeting, Oct 24-28, 2011 Crete

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO/IEC JTC1/SC32/WG2 N1599 SC38 Liaison Report to SC32at SC32 meeting, Oct 24-28, 2011 Crete Baba Piprani/Canada SC38SC32 Liaison

  2. Past meeting… • 4th meeting of JTC1/SC38 was held in Seoul, Korea 19-23 September, 2011 • Participating Countries: Brazil, Canada, China, Finland, France, Germany, Ireland, Japan, Republic of Korea, Norway, Poland, UK, USA, Singapore, and Sweden • Liaison members from: DMTF, ITU-T, INLAC, OASIS, Open Group, SNIA • First meeting to have parallel sessions for SGCC and WG2 (SOA)

  3. WG2 (SOA) • Had 3 successful teleconferences prior to Korea to resolve Clause 3 and 4 of WD30102 – General Technical Principles of SOA • Meeting recommended WD  PDTR for 3 month ballot (initiate Oct 31) • New Clause 5 harmonizes Annex content containing various Reference Models • PDTR contains summary of SC32 WG2 19763-7 Service Registration in Annex E

  4. WG2 (SOA) • SOA overlap with SC7 needs attending • WG2 holding 6 teleconferences prior to Berlin SC38 meeting mid May, to address WG7 overlap, prep work on developing NWI on SOA Reference Architecture, and PDTR ballot comments • Initiated work on semantic model for addressing key concepts and ontology for technical relationships in PDTR 30102

  5. WG2 SOA change in TOR (new in red)

  6. WG 2 Future Plan of Work-1 • Develop a New Work Item proposal for a International Standard on SOA Reference Architecture to include Terminology, Concepts and TechnicalRA • Initiate a modeling effort that will explore key concepts and ontology on the technical relationships identified in TR 30102 (input to this effort to include SC 38 N 369, French National Body Contribution on SOA Conceptual Model in WD 30102 V2)

  7. WG 2 Future Plan of Work -2 3. Initiate discussions on interoperability requirements (input to this discussion to include SC 38 N 368, Chinese National Body Contribution on WG 2 Future Work) 4. Initiate discussions on scope between SC38 and SC7 based on SC7 Liaison Contribution (SC 38 N 315)

  8. Study Group on Cloud Computing (SGCC) • Completed SGCC report • SGCCWG3 (new) Cloud Computing, if approved • Next interim meeting (1st WG3 meeting) Vancouver, Canada Feb 2012 • Full SC38 Plenary and WG meetings, Berlin, mid May

  9. New TOR SC38 WG3 (Cloud Computing) • Identify, develop, and maintain JTC 1 deliverables initially in the field of Cloud Computing Reference Architecture and Terms and Definitions. • Investigate the requirements for new work in the areas of Use case Analysis Methodology and Principle of Cloud Service Delivery, as provided in Clause 5.2 of the Study Group Report on Cloud Computing (SC 38 N 430).

  10. New TOR SC38 WG3 (Cloud Computing) 3. As a basis for the evaluation and development of new work, utilize a use case-based methodology as described in the SC 38 Study Group Report on Cloud Computing (SC 38 N 430) as appropriate. 4. Support SC 38 goals and respond to requests pertaining to Cloud Computing initiated by SC 38, JTC 1 and external Liaisons organizations.

  11. New TOR SC38 WG3 (Cloud Computing) 5. Liaise and collaborate with SDOs and consortia related to Cloud Computing as appropriate. 6. Maintain future JTC 1 PAS and Fast Track submissions assigned to SC 38 in the area of Cloud Computing.

  12. New Work Item proposal - WG3 (Cloud Computing) • New Work Item Proposal (NWIP) on Cloud Computing Vocabulary (SC38 N0431) for ballot. • New Work Item Proposal on Cloud Computing Reference Architecture (SC38 N0432) for ballot

  13. Suggested Follow up Work for SC32 WG2 • Review PDTR Annex E SC32 SOA Registry Metamodel and align with 19763-7 • Summary • Figure • Any proposed additons/deletions • Review SGCC Report (Cloud Computing) for interoperability relevance • Review /track work on SC38 WG3’s NWIs re: Reference Architecture

More Related