1 / 57

IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha

IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain, Jane. JUNE 17 -21, 2013. “Let each of you Look not to your own interests, But to the interests of others.”. GOOD FELLOWSHIP ROOM

annis
Download Presentation

IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IN GOD’S HANDS SERVICE CAMP 2013 Attended by Ruth, Barb, Carrie, Gilda, Patty, Martha Karl, Keith, Paul R., Ayars Parker, Kevin, James, Hunter and Chaplain, Jane

  2. JUNE 17 -21, 2013 “Let each of you Look not to your own interests, But to the interests of others.”

  3. GOOD FELLOWSHIP ROOM Since it was raining at 8:00 AM, plans were discussed early Monday morning

  4. Mr. & Mrs. Curtiss’ Home Build a handicapped ramp & deck Replace the rotten boards on the shed Paint the new boards on the shed Paint the windows Paint the cinder blocks around the house

  5. The Curtiss’ home before we began

  6. Karl scraped the siding before it needed to be painted.

  7. Gilda paints

  8. Carrie mostly paints the building

  9. Meanwhile, the fellas are working on the old steps.

  10. Ruth and Carrie give the shed a coat of paint.

  11. Lunch break with Jane bringing us the message.

  12. Posts were set in concrete and made level.

  13. James supervises the mixing of the concrete.

  14. Painters clean up the brushes, but not themselves.

  15. Karl replaces the trim on the shed.

  16. Building the supports for the deck and ramp

  17. Putting the decking down

  18. Keith and James creating the ramp

  19. James testing out the deck while Gilda and others watch.

  20. Carrie painting the foundation

  21. Ruth found it necessary to trim the bushes before painting the foundation.

  22. Karl & Kevin measuring to replace boards.

  23. Putting the decking down.

  24. Using their feet to hold boards in place

  25. Parker & Keith setting the rest of the ramp.

  26. Getting ready to put on the railings

  27. Ruth, Kevin, & Martha finishing the ramp.

  28. The decks and ramps finished.

  29. Parker & Keith measure for the railings

  30. Gilda painting under the eaves

  31. Cutting the boards to fit properly

  32. Ayars making adjustments underneath the deck

  33. Creating the steps that go toward Mr. Curtiss’ workshop

  34. Sue Anne dropped by for a visit

  35. Ms. Mayflower’s Home Gutters on the back of her house Covered the eaves on the porch we built two years ago Placed flex hoses and splash guards

  36. Materials ready for the other site

  37. Kevin takes a nap while waiting for the homeowner.

  38. Gutters put up and drain pipes set in place

  39. Work began at the second site

  40. Kevin and Karl placing the gutters

  41. Flex hoses are attached to the downspouts

  42. Splash guards are placed on others.

  43. Finished job

  44. A visit to the Charles City dump to get rid of our site trash

  45. Project finished

  46. In front of the newly painted shed

  47. Ms. Brown’s house August 22, 23, & 25 & 30 Ruth Adams Kevin Cornelius Keith Fuhrmeister Ayars Lore Martha Martin

  48. Two full days & two part days Remove everything from her enclosed porch. Pull out the flooring. Replace the floor joists. Cleaned the furniture, including freezer Repair the washer connections Replace the sub-floor & floor Repair & replace ceiling tiles

  49. “Hand me one of those…..”

  50. Measuring and setting the joists for the floor.

More Related