An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An Inspector’sPrimer Larry Johnson Harris County

  2. Topics to be discussed today • Preparing Before the Inspection • During the Inspection • Follow-Up After the Inspection Focusing on field inspections for systems trying to get an Authorization to Operate

  3. Preparing for an Inspection- Spray System • Gather Documentation: • Design Summary • Flow Diagram • Approved Plans, including site layout • Maintenance Contract • Electronic Monitoring Registration Sheet (if applicable)

  4. Preparing for an Inspection- Drip System • Gather Documentation: Requires everything you need for a spray inspection PLUS: • Soils Evaluation • Effluent Loading Evaluation

  5. Preparing for an Inspection-Systems Located within 100-Year Floodplain Additional Documentation Required: • Elevation Certificate • Floodplain Maps • Buoyancy Calculations

  6. Preparing for an Inspection-For Sites with Water Wells • Additional Documentation that may be Required: • Water Well Log (if applicable) • Well Plugging Report (if applicable)

  7. Gather Inspection Tools You’ll need: • Level • Wheel • Tape • Probe • Personal Protective Equipment (safety vest, safety hat, safety glasses)

  8. Preparing for an Inspection-Basics • HCAD (Tax) Map • Key Map Location • Set Up Appointment Time with Installer Now you’re ready to go!

  9. During the Inspection • Verify the Plans with the Site Conditions • Meet with the Installer to get necessary documents from them • As-Built (if necessary) • Any forms missing from pre-inspection research

  10. The Inspection • Begin at the structure • Verify two-way cleanout • Verify piping material acceptable • Continue through system • Verify 1/8 inch fall in pipe from structure to tank

  11. The Inspection • At the Tanks • Verify inlet and outlet tee’s in trash tank • Are all tanks & chlorinator on Harris County (or your entity’s) approved tank list? • Verify tanks are level • Are the air compressor & diffusers working properly? • Check alarm floats and pump floats

  12. Flow Diagram Example NTS

  13. The Inspection • The Disposal Field- Spray • Check sprayhead radius • Check set-backs • Grading & Vegetation • The Disposal Field- Drip • Depth of drip lines • Number of lines & length of each • Check set-backs

  14. The Inspection • Fill out inspection sheet • Have installer sign with OSSF installer license number • If it passed, you’re done. • If not, please proceed to following slides.

  15. The Follow-Up • Only reinspect areas that failed. Corrections required are called out in paperwork from initial inspection. • If at first you don’t succeed, try try again. But in Harris County, after your second inspection, you will pay for all additional inspections until you pass. We will charge you what it costs us to reinspect.

  16. Questions?