REX (1/2) day Power converters

REX (1/2) day Power converters. Problems encountered during the year 2004 Works done during this shut down To do before next run. Problems encountered during the year 2004. Fug 60kV for the pulsed EBIS plate form (repaired at manufacturer).

Download Presentation

REX (1/2) day Power converters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REX (1/2) dayPower converters Problems encountered during the year 2004 Works done during this shut down To do before next run

  2. Problems encountered during the year 2004 • Fug 60kV for the pulsed EBIS plate form (repaired at manufacturer). • Problems in some Heinzinger high voltage cassettes for the Separator. • Malfunctions in Wago control crate for the Separator (cabling & assembling problems). • Problems with some Danfysik 858 for triplets lens in the linac section (three phases controllers broken & water leakage in some power converters). Rex 1/2 Day - Power converters - N.David

  3. Works done during this shut down • Preventive maintenance on Trek Power Amplifier (2 fans replaced). • 32 Heinzinger high voltage cassettes were checked (6 modules were found in bad conditions : bad solders, bad contacts…). • 32 Heinzinger high voltage cassettes were updated for vacuum interlock (negative logic to ensure security). • Danfysik 858 were checked (3 three phases controllers replaced). • Pre-installations for new Simatic control system (for Separator & Linac section) : - Installation of new rack for Steerer – Separator & Bender magnets power converters (power and control crate) - 22 Danfysik are now ready for RS422 (add SubD25 connector on all rear panel) - New design for Heinzinger high voltage cassettes crates (includes modifications for vacuum interlock) Rex 1/2 Day - Power converters - N.David

  4. To do before next run • Installation and test of TREK power amplifier for replacement of the Fug 60kV in case of failure. • Add temporary cut off system on Heinzinger DC24V source for vacuum interlock (while waiting for new crates). • Replacement of 2 old 24DC3500 crates by 2 Isolde 24DC3500 crates with negative logic for vacuum interlock in the BTS section (loan by J. Parra-Lopez) Rex 1/2 Day - Power converters - N.David