Analysis for Construction Environmental Management

Analysis for Construction Environmental Management. . Z.Chen PhD Candidate Workshop Coordinator CIB Student Chapter (HK) Department of BRE The HK PolyU 24 September 2002.

apria
Download Presentation

Analysis for Construction Environmental Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis for Construction Environmental Management  Z.ChenPhD CandidateWorkshop Coordinator CIB Student Chapter (HK)Department of BRE The HK PolyU 24 September 2002 Analysis for Construction Environmental Management

  2. What’s Construction Environmental Management? What can Quantitative Approaches Do? Where will the Quantitative Research Go? Analysis for Construction Environmental Management

  3. What’s Construction Environmental Management? Environmentally Conscious Construction Analysis for Construction Environmental Management

  4. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  5. What can Quantitative Approaches Do? CPI: Construction Pollution Index Definition: a quantitative measure of pollution and hazards (P&H) generated by a construction project or a specific construction operation during construction. Equation: CPI — CPI of a construction project; CPIi — CPI of a specific construction operation i; hi — P&H magnitude per unit of time generated by operation i; Di — Duration of the construction operation i; n — Number of construction operations that generate P&H. Analysis for Construction Environmental Management

  6. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  7. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  8. What can Quantitative Approaches Do? IRP: Incentive Reward Program Definition: a quantitative analysis & control tool for on-site material management, and to motivate workers to reduce material waste. Equation: i — Materials; j — Groups; Q — Quantity of material; P — Price of material; C — Cost of material; n — Number of tasks using material i. Analysis for Construction Environmental Management

  9. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  10. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  11. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  12. What can Quantitative Approaches Do? Analysis for Construction Environmental Management

  13. Where will the Quantitative Research Go? LCA: Lifecycle Analysis Analysis for Construction Environmental Management

  14. Thank you! Analysis for Construction Environmental Management