1 / 42

LISA PathFinder and LISA

LISA PathFinder and LISA. Alberto Lobo ICE-CSIC & IEEC. Summary. LISA objectives and current status LISA PathFinder “raison d’être” : the LTP LPF mission status Spanish involvement in LISA and LPF : Diagnostic subsystem and DMU The IEEC team and project basic structure

aquarius
Download Presentation

LISA PathFinder and LISA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LISA PathFinder and LISA Alberto Lobo ICE-CSIC & IEEC Appec Spain, IFAE 2-vi-2006

  2. Summary • LISA objectives and current status • LISA PathFinder “raison d’être”: the LTP • LPF missionstatus • Spanish involvement in LISA and LPF: • Diagnostic subsystem and DMU • The IEEC team and project basic structure • Mid and long term future prospects Appec Spain, IFAE 2-vi-2006

  3. LISA Appec Spain, IFAE 2-vi-2006

  4. LISA concept Test masses 5 million km, 30 mHz Transponder scheme Appec Spain, IFAE 2-vi-2006

  5. LISA orbit Appec Spain, IFAE 2-vi-2006

  6. inclination 0.01 eccentricity o 1 Orbit dynamics Appec Spain, IFAE 2-vi-2006

  7. LISA sensitivity Appec Spain, IFAE 2-vi-2006

  8. LISA’sassured sources Appec Spain, IFAE 2-vi-2006

  9. LISA spacecraft Science module Downlink antennas FEEP Baffle Appec Spain, IFAE 2-vi-2006

  10. LISA spacecraft Appec Spain, IFAE 2-vi-2006

  11. LISA spacecraft Appec Spain, IFAE 2-vi-2006

  12. LISA current status • LISA was formally approved as a cornerstone mission of • ESA’s Horzion 2000+ programme • It was required to be a 50%-50% collaboration with NASA • LISA programme includes LPF • LISA’s launch date is in standby, as LPF results are needed • before is authorised to fly • In addition, NASA is applying budgetary cuts, mostly in view • of its new exploration priorities (Bush, 2004) • Still, an industrial formulation phase is currently underway • at Dornier Satellitensysteme, under ESA contract Conclusion is: LPF is paramount, every effort must be applied to doing it Appec Spain, IFAE 2-vi-2006

  13. LPF Appec Spain, IFAE 2-vi-2006

  14. LISA’s requirements are extremely demanding. Drag free subsystem can not be fully tested on Earth. A previous, smaller technology mission, will assess feasibility: LISA PathFinder (formerly SMART-2) LPF It will carry on board the LTP. However it will be in a smaller scale, both in size and sensitivity. • Essentially, LTP will check: • drag free technology • picometre interferometry • other important subsystems and software Appec Spain, IFAE 2-vi-2006

  15. LTP Objectives: • Drag-free • Interferometry • Other… 30 cm LTP concept 1. One LISA arm is squeezed to 30 centimetres: 2.Relax sensitivity by one order of magnitude, also in band: Appec Spain, IFAE 2-vi-2006

  16. LTP current design Appec Spain, IFAE 2-vi-2006

  17. LTP and host spacecraft Appec Spain, IFAE 2-vi-2006

  18. Lagrange L1 • Launch: Autumn-2009 from Pliesetsk • Launch vehicle: Rockot • Travel time: • Mission lifetime: LPF orbit Appec Spain, IFAE 2-vi-2006

  19. LPF operation orbit and injection Appec Spain, IFAE 2-vi-2006

  20. LPF operation orbit and injection Appec Spain, IFAE 2-vi-2006

  21. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  22. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  23. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  24. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  25. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  26. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  27. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  28. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  29. Drag-free working concept Appec Spain, IFAE 2-vi-2006 Courtesy of S. Vitale

  30. Diagnostics and Data Management Unit (DMU) DMU and diagnostics box Diagnostics end items LTP functional architecture Appec Spain, IFAE 2-vi-2006

  31. DDS: Data Management& Diagnostics Subsystem • Diagnostics items: • Purpose: • Noise split up • Sensors for: • Temperature • Magnetic fields • Charged particles • Calibration: • Heaters • Induction coils • DMU: • Purpose: • LTP computer • Hardware: • Power Distribution Unit (PDU) • Data Acquisition Unit (DAU) • Data Processing Unit (DPU) • Software: • Boot SW • Application SW: • Diagnostics • Phase-meter • Interfaces Appec Spain, IFAE 2-vi-2006

  32. LTP thermal diagnostics Appec Spain, IFAE 2-vi-2006

  33. LTP thermal sensors test Appec Spain, IFAE 2-vi-2006

  34. LTP Radiation Monitor • It is a particle counter with some • specific capabilities: • It counts particle hits • Retrieves spectral information • (coincident counts) • Can (statistically) tell GCR from • SEP events • Electronics is space qualified Appec Spain, IFAE 2-vi-2006

  35. In place for test at PSI, Nov-2005 Appec Spain, IFAE 2-vi-2006

  36. In place for test at PSI, Nov-2005 Appec Spain, IFAE 2-vi-2006

  37. Thermal: • Juan Ramos, UPC • Pep Sanjuan, IEEC • Miquel Nofrarias, IEEC • Alberto Lobo, CSIC & IEEC • Magnetic: • Lluís Martínez, Atipic • Sergi García, Atipic • Radiation Monitor: • Mokhtar Chemeissani, IFAE • César Boatella, IEEC • Carles Puigendoles, IFAE • Henrique Araujo, ICL • Peter Wass, ICL • Catia Grimani, Univ. Urbino • Software: • Joan Clua, NTE (?) • José Antonio Ortega, IEEC • Xevi Xirgu, IEEC • Aleix Conchillo, IEEC • Héctor García, NTE • Management: • Ivan Lloro, PM, IEEC • Josep Colomé, Doc, IEEC • Albert Tomàs, SE, NTE • Xavi Llamas, SM, NTE • Sònia Ferrer, PA, NTE • PI: • Alberto Lobo, CSIC & IEEC Spanish LPF team Appec Spain, IFAE 2-vi-2006

  38. LPF International Consortium Appec Spain, IFAE 2-vi-2006

  39. Mission: SSO DLR Payload: • Platform: Astrium UK • Payload: Astrium Friedrichshafen Prime contractor: LPF International Consortium Appec Spain, IFAE 2-vi-2006

  40. ~3.6 M€ for 2004-2007 PNE Spanish collaboration structure Industrial contractor Research group Appec Spain, IFAE 2-vi-2006

  41. Future prospects Ultimate goal is of course to see GWs and do Physics with them... • For this, we envisage two major steps: • LISA PathFinder • Complete undertaken duties • Team-build, much stress on engineer component • LISA • Look forward to an even stronger involvement in • mission definition and construction, both hardware • and science matters. • First hand access to science yield. Appec Spain, IFAE 2-vi-2006

More Related