1 / 16

Ch. Hartinger / L. Barl

Ch. Hartinger / L. Barl. Ge:Ga Detector Arrays. Overview. Performance results of FM HS Modules Status of the LS & HS Array Integration. FM HS Modules. 8 Test Runs (32 modules) MPE Test Equipment Improvements 10 filter capacitors at the connector distribution panel inside the cryostat

archer
Download Presentation

Ch. Hartinger / L. Barl

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ch. Hartinger / L. Barl Ge:Ga Detector Arrays MPE - Ge:Ga Detector Array

  2. Overview • Performance results of FM HS Modules • Status of the LS & HS Array Integration MPE - Ge:Ga Detector Array

  3. FM HS Modules • 8 Test Runs (32 modules) • MPE Test Equipment Improvements • 10 filter capacitors at the connector distribution panel inside the cryostat • Sense lines for the VDDA, VSS, GRD, VDDr and Zero_bias supply lines • Optics include only a black body, 1 mirror but no attenuation filters • Stability of BB temperature is < 1 mK • Standard Measurements • Warm functional test at RT checks the supply currents • Cold functional test at 4 K and the output frames • Cold performance test (1.85 K) • Dark current • Noise Equivalent Power (NEP) • Responsivity MPE - Ge:Ga Detector Array

  4. Cold Performance Test Dark current • Background of 4.2 K corresponds to a flux < exp(-18) W/pixel MPE - Ge:Ga Detector Array

  5. Cold Performance Test Dark current • Strong variation between modules MPE - Ge:Ga Detector Array

  6. Cold Performance Test Noise Equivalent Power (NEP) • The modules behave very similar up to a bias of 70mV, where the sensitivity is maximal • The NEP is strongly dependent on the flux MPE - Ge:Ga Detector Array

  7. Cold Performance Test Responsivity • The responsivity varies by more than a factor 3 for different modules • The arrangement in the detector array was chosen according to the responsivity MPE - Ge:Ga Detector Array

  8. HS Integration Distribution of the Responsivity in the TEL Focal Plane The modules with the high values were positioned at the center of the array MPE - Ge:Ga Detector Array

  9. Cold Performance Test Homogeneity of the Responsivity FM190: strong gradient FM174: almost homogeneous Each module has its own characteristic distribution not caused by an inhomogeneous flux MPE - Ge:Ga Detector Array

  10. The test optics delivers a nearly homogeneous flux distribution Cold Performance Test Reproducibility of the measurements Multiple tests of modules at different positions in the set-up Different distribution between the two tests (FEE exchanged, connections re-glued) Very good reproducibility of the data points after two tests (FEE changed) MPE - Ge:Ga Detector Array

  11. HS-Detector Status HS-Modules Status after Integration • 25 modules integrated • 2 open pixels • 2 pixel connections cut • 2 calibrated temperature sensors • (FM161 + FM168) ESD protection by aluminized cigarette wrapping paper during the integration MPE - Ge:Ga Detector Array

  12. HS-Detector Status Arrangement of the HS-Modules Front view of the HS-detector MPE - Ge:Ga Detector Array

  13. LS-Detector Status Arrangement of the LS-Modules • 25 modules integrated • in FM 107 + FM 135 behavior of few pixels undetermined • 3 open pixels • 1 pixel connection was cut • 2 calibrated temperature sensors • (FM132 + FM135) MPE - Ge:Ga Detector Array

  14. P Mechanical Parts P Blackened Baffles P Cable Mount BD P 4K Post BD P Integration Tool BD P HP Heater P Harness P Flasher P Sapphire P Filter FLBS P 25 Detector Modules P Suspension Feet P Mechanical Design Blue Detector Array Distribution BD P Cooling Strap BD KT MPE ASTEC QMC J.B. Integration Status FM Blue Detector Assembly – Integration Status FM PACS Blue Detector Array MPE - Ge:Ga Detector Array

  15. P Housing Frame Baffle Frame P Mechanical Parts Flat Mirror Baffling System Blackened Baffles 2K Cooling Stap I/F Sapphire P Mirror Red Detector P P Cable Mount RD P 4K Post RD P Integration Tool RD HP Heater P Filter P Harness Filter Baffles P Flasher Filter Mount (5 Stripes) P Sapphire Filter FLRS1 RD P 4K Cooling Staps P FM PACS Red Detector Array 25 Detector Modules Detector Modules with FO Clamping Device P Suspension Feet P Distribution RD Mechanical Design Red Detector Array KT MPE ASTEC QMC J.B. Cooling Strap RD P Filter FLRS2 Pupil RD Integration Status FM Red Detector Assembly – Integration Status MPE - Ge:Ga Detector Array

  16. Work in Progress • Bake out at 80°C for 3 days • Final inspection prior to delivery to KT • Warm functional test after cold vibration test MPE - Ge:Ga Detector Array

More Related