1 / 18

Gas pipeline interconnection possibilities

Gas pipeline interconnection possibilities. Energy in SEE – A must for development Portorož, 22 – 23 June 2010 Goran Frančić Plinacro, Director of Development Division. ROGATEC. 100.000. 210.000. DRAVASZERDAHELY. MOLVE. SV. IVAN ŽABNO. ZABOK. ZAGREB. BELI MANASTIR. BJELOVAR. LUČKO.

archiedixon
Download Presentation

Gas pipeline interconnection possibilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas pipelineinterconnection possibilities Energy in SEE – A must for development Portorož, 22 – 23 June 2010 Goran Frančić Plinacro, Director of Development Division

  2. ROGATEC 100.000 210.000 DRAVASZERDAHELY MOLVE SV. IVAN ŽABNO ZABOK ZAGREB BELI MANASTIR BJELOVAR LUČKO D. MIHOLJAC 30.000 KARLOVAC BELIŠĆE UMAG OSIJEK OMANOVAC KUKULJANOVO PSP OKOLI POŽEGA BOSILJEVO DOBROVAC SLOBODNICA JOSIPDOL S. BROD 240.000 OMIŠALJ NOVA KAPELA B. BROD VODNJAN PULA 280.000 GOSPIĆ ZADAR KNIN BENKOVAC SPLIT PLOČE

  3. Developmentprojects

  4. Interconnection possibilities

  5. Croatia-Hungary Interconnection

  6. Croatia-Hungary Interconnection

  7. Croatia-BiH Interconnection

  8. Croatia-BiH Interconnection

  9. Croatia- Serbia Interconnection

  10. Croatia-Slovenia Interconnection ZABOK

  11. Croatia-Slovenia Interconnection ZLOBIN

  12. Croatia-Italy Interconnection ZLOBIN

  13. existing planned Ionian Adriatic Pipeline Project TAG Varosfold Tarvisio SOL Gorizia Zagreb D. Miholjac Bosiljevo Pula 825 km 2.5 BCM Casalborsetti 1.0 BCM Ploce 420 km 0.5 BCM Montenegro 237 km IAP 1.0 BCM Tirana 75 km 0 km TAP Fieri

  14. Ionian Adriatic Pipeline Project

  15. IAP Activities Lika and Dalmatia options DN 500 Troughput scenario 2.5 BCM/a DN 800 Troughput scenario 7.5 BCM/a

  16. IAP Activities BiH + MN Interconnection

  17. Interconnection possibilities

  18. Thanks! Energy in SEE – A must for development Portorož, 22 – 23 June 2010 Goran Frančić Plinacro, Director of Development Division