1 / 6

Supplier Treasure Hunt Results

Supplier Treasure Hunt Results. Hosted by Advics & GECOM Sponsored by TEMA July 27 th -28 th , 2008. Participants. Advics GECOM IMA NSK TEMA – Facilities. Where did we look? . Facilities – Avanzar & Toyotetsu Advics – Brake Caliper Grinding, Plating, & Assembly

Download Presentation

Supplier Treasure Hunt Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Supplier Treasure Hunt Results Hosted by Advics & GECOM Sponsored by TEMA July 27th-28th, 2008

  2. Participants • Advics • GECOM • IMA • NSK • TEMA – Facilities

  3. Where did we look? • Facilities – Avanzar & Toyotetsu • Advics – Brake Caliper Grinding, Plating, & Assembly • GECOM – Door latches, Sliding door components, Door & compartment locks

  4. Top 3 What did we find? • Setback spot coolers during weekends • Completely power down idling process lines • Turn off process cooling fans when machines turn off • Energy Savings ~ 1 Million KWh/yr • Cost Savings ~ $69,000/Yr ($48k with ZERO implementation cost

  5. What did we find? Top 3 • Lighting Replace HID with HIF (plant) • Setback HVACs between shift & non production • Turn off chiller, cooling towers, and related pumps (when possible) during weekends • Energy Savings ~ 1.9 Million KWh/yr • Cost Savings ~ $118,000/Yr ($55k savings with ZERO investment)

  6. Questions/Comments Thank you!

More Related