NFS Test Portal

NFS Test Portal. Results. Compliance. System Performance. System Availability YTD (Severity 1) = 99.51% Target for System Availability = 99.80% (Source: ITS, 04 Feb ‘13). MNL YTD = 54% DSL YTD = 62% (Source: NFS Test Portal, 04 Feb ‘13). Targets. Issues & Resolutions.

argus
Download Presentation

NFS Test Portal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NFS Test Portal Results Compliance System Performance System Availability YTD (Severity 1) = 99.51% Target for System Availability = 99.80% (Source: ITS, 04 Feb ‘13) MNL YTD = 54% DSL YTD = 62% (Source: NFS Test Portal, 04 Feb ‘13) Targets Issues & Resolutions Enhancements

  2. Compliance – Pressure Point (!) • Although system problems are experienced, it exceeded the acceptable System Availability of 85%. Actual System Availability YTD for Severity 1 incidents (as measured by ITS) = 99.51%. • Compliance by NFS staff to use NFS Test Portal – as a tool to assist them & to enhance service delivery to customers – is problematic…. • only 45% exceed usage/testing of 60% on MNL testing • Target 70% • only 47% exceed usage/ testing of 60% on DSL testing • Target 80% • Users are not measured based on the failure rate ór the result of the test, but rather whether a test was done. If a test was done on the Portal and it fails due to a IT system or IRTMS, the technician gets the benefit that he/she has tested the service.

  3. YTD compliance by all Users 4 284 Users 45% 55% 4 206 Users 53% 47% Source: NFS Test Portal Reports – YTD (Apr ‘12 – Jan ’13) Users: M6, OP1, OP2 & Contractors

  4. Way forward • Based on utilisation graph, we need to agree on target to be achieved for ePDMSevaluation. • Comply (Y) / Do no comply (N) • 12.5% weighting • 8 PEP measures • Proposal: • DSL 60 % compliance for 2012/13 • MNL 50 % compliance for 2012/13 • Social partners to encourage members to utilise the NFS Test Portal, in order to improve our service to customers; ensure that ‘quality’ work orders are completed; and effective utilisation of resources (ie. time; vehicles; labour & costs).