An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A less expensiveforward endcap calorimeteras a fallback position David Hitlin Frascati SuperB Workshop April 4, 2011

  2. The forward EMC endcap • The higher rates and radiation does of SuperB motivate replacing the BABAR CsI(Tl) endcap with a faster, denser, more radiation hard version: CsI(Tl)  LYSO • If there is pressure to reduce costs, there is a way to do this without discarding the work of the last several years: • Moliere radius of LYSO = 1/2 Moliere radius of CsI(Tl) • CsI crystals in the outer rings of the endcap should see rates and radiation doses similar to the forward end of the barrel • This leads to consideration of the following design: • Retain the mechanics of the BABAR endcap • Use 4 LYSO crystals in each existing CsI(Tl) compartment • Retain outer three rings of CsI(Tl) • A consequence is that the potential 10cm in front of the forward endcap does not become available for PID { Saves cost of new mechanics {Saves 40% of LYSO volume

  3. BABAR(SuperB)crystal layout

  4. Can we retain the existing BABAR endcap mechanics? • The current endcap consists of 20 carbon fiber modules in two ‘D’s • Each module contains 9 rings of CsI(Tl) crystals (only the outer 8 are filled)

  5. Radiation dose map • Hilger • Shanghai • Kharkov

  6. Radiation monitor positions

  7. Radiation dose (radfets) • The radiation dose as measured by anarray of radfets has been studied by Aidan Randle-Conde and David Doll • The radiation dose is a function of polar angle • The time distribution of radiation dose does not track the integrated luminosity: it appears to have both luminosity- and current- related components (unfortunately, the currents were not included in the n-tuples)

  8. Crystal response to radiation dose • The diminution of light output with radiation dose varies with crystal provider • The endcap contains some of the best crystals (SIC) and some of the worst (Hilger) Average over crystal providerwithin each ring

  9. Crystal response to radiation dose • The diminution of light output with radiation dose varies with crystal provider • The endcap contains some of the best crystals (SIC) and some of the worst (Hilger) There is a large variation in response within each ring

  10. Segmentation of the endcap Different combinationsof rings are possibleNumbers of rings can be staged

  11. CsI(Tl) endcap crystal nominal dimensions Ring QTY A B C D E F Length Volume 1 EC 120 4.555 4.685 4.345 5.395 5.805 5.135 32.5 840.4 2 EC 120 4.320 4.680 4.115 5.100 5.790 4.850 32.5 793.6 3 EC 120 4.080 4.685 3.895 4.805 5.795 4.575 32.5 749.9 4 EC 100 4.670 4.690 4.400 5.485 5.475 5.170 32.5 824.5 5 EC 100 4.390 4.690 4.115 5.160 5.475 4.840 32.5 773.7 6 EC 100 4.105 4.690 3.835 4.829 5.475 4.510 32.5 722.6 7 EC 80 4.825 4.685 4.475 5.670 5.470 5.265 32.5 845.0 8 EC 80 4.475 4.690 4.120 5.215 5.420 4.805 30.5 725.9 9 EC 80 ? ? ? ? ? ? ? ? Retain Rings 1-3360 crystals (1440 LYSO) New (Rings 4-9) 2160 LYSO Unfilled in BABAR

  12. Michel Lebeau’s email comment after Feb presentation “Clearly if budget conditions are decisive, and total saving of about 3M€ is at stake, the recycling of the Babar endcap structure and ancillaries is already 1/3 of THE solution, provided the absence of the PID is tolerable.Nesting 4 LYSO xals into one CsI alveolar is a very smart solution as it keeps the structure open to any LYSO/CsI ratio very late in design and construction. Maybe the (wall thickness x density) ratio to (xal size x number) is not as good as with my alveolar, but this is what it is !”

  13. Conclusion • A combined CsI(Tl)/LYSO solution makes an excellent fallback position, if there is not sufficient funding for a full LYSO endcap • It is straightforward to include as an option in the TDR, while an orthogonal solution does not appear as a natural evolution • Lends itself to staging, if this is necessary • All R&D work is essentially complete • Calibration system can be used as is, saving additional money • Aprroximate cost saving for 3 CsI/6 LYSO rings: €2.4M (@ € 30/cc) + €1M mechanics + €0.25M (calibration)= €3.65M