NGA-USGS-NORTHCOM Data and Production Alignment. Gregg Badger National Geospatial-Intelligence Agency (NGA) Source Foundation Based Operations Group Gregg.r.badger@nga.mil 301-227-3805 15 September 2009. UNCLASSIFIED. NGA Geospatial Data Strategy: Data Domains. Geodetic Information.

arlo
Download Presentation

NGA-USGS-NORTHCOM Data and Production Alignment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NGA-USGS-NORTHCOM Data and Production Alignment Gregg Badger National Geospatial-Intelligence Agency (NGA) Source Foundation Based Operations Group Gregg.r.badger@nga.mil 301-227-3805 15 September 2009

  2. UNCLASSIFIED NGA Geospatial Data Strategy: Data Domains Geodetic Information DENSITY Features/ Political Geography Controlled Mono Controlled Stereo Aero Elevation Maritime Magnetic Gravity Strategic Planning GLOBAL Some Data Everywhere Operational Planning REGIONAL Better density in Priority derived regions Tactical Planning LOCAL Higher density, support mission operations Special Operations SPECIALIZED Highest density, support time-sensitive operations UNCLASSIFIED

  3. UNCLASSIFIED//FOUO LEGEND Process Start NGA Task COCOMs/Services/Joint Staff Task Agencies Task NSG (FDRPF) Geospatial Information Requirements Process CJCSI 3901.01b (2008 Draft) 2 4 State of the Data Initial Requirements Evaluation Agencies Consolidation Prioritization Nov 2009-Feb 2010 7 Consolidation Evaluation 1 5 Initial Requirements Evaluation Initial Production Plan Integration 3 Requirements Consolidation Prioritization JS Consolidation Prioritization 6 Consolidation Evaluation Regional Days 8 Customer Feedback Source Feasibility Jul – Nov 2009 9 10 Final Production Plan Prioritization FY Integrated Production Plan 13 11 Provide Final Status Production Quarterly Updates and Governance 12 Execute Plan Feb 2010 14 Reprioritization Of Production Plan UNCLASSIFIED//FOUO

  4. UNCLASSIFIED//FOR OFFICIAL USE ONLY Requirements and Production Process must be Transparent Which Requires GIS based Visualization Tools UNCLASSIFIED//FOR OFFICIAL USE ONLY

  5. UNCLASSIFIED Limited resources and increasing data requirements Integration of geospatial data produced by many different sources – need for standardization (Extraction guidance, data dictionaries, symbology) Eliminate redundancy, improve data quality Better meet data requirements of geospatial data users NGA-USGS-NORTHCOM Data and Production Alignment: Why? Benefits: Improved data and mission interoperability, more efficient use of resources, resulting in greater data coverage… a better, more accurate and current, common operational picture! UNCLASSIFIED

  6. UNCLASSIFIED Sean Carasco AGC & MCIA’s Ft Belvoir & Cp Lejeune Tom Stephan EUCOM, 60th GPC, Heidelberg, GER TBD STRATCOM, Omaha, NE TBD AFRICOM, Molesworth, UK TBD SOUTHCOM, 512th En, Ft Sam Huston, TX TBD CENTCOM, 132nd GPC, Ft Gillem, GA J.R. Booker PACOM, 7th GPC, Ft Shafter, HA Deployment Plan FY09 (2) FY10 (2) FY11 (2)* Data Steward only (FY09) *Data Stewards will deploy during FY10 to ensure the AFRICOM and STRATCOM TGDs become IOC early in FY11 NGA’s International and DoD Geospatial Partners • Building the FBO Structure: Data Stewards at the COCOMs • Partnership with AGC & MCIA • Direct support to Theater Geospatial Database (TGD) • Satisfying Command FBO requirements • MOA between NGA and COCOMs • On-site Data Steward and contractor production at COCOMs • Facilitates data dissemination back to NGA UNCLASSIFIED

  7. UNCLASSIFIED NGA-USGS-NORTHCOM Data and Production Alignment: Way Ahead • Participate in the Foundation Based Operations (FBO) National System for Geospatial-Intelligence (NSG) Operations Executive (NOX) Forum, to better align Geospatial Data Production • 13-16 October in Chantilly VA - present FY10 and 11 production plans. • Coordinate with NORTHCOM GI&S Officer and NGA Source • Develop common data standards • Use the NGA/USGS MOA for joint projects • Example – NGA provide USGS imagery source for NORTHCOM requirement. USGS produce data and maps. UNCLASSIFIED