Corporate Finance ( FIN622 ) Internal Rate of Return (IRR)

Corporate Finance ( FIN622 ) Internal Rate of Return (IRR). I R R Internal Rate of Return. What is IRR ?. The discount rate often used in capital budgeting that makes the net present value of all cash flows from a particular project equal to zero.

armand
Download Presentation

Corporate Finance ( FIN622 ) Internal Rate of Return (IRR)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Corporate Finance( FIN622 )Internal Rate of Return (IRR) Virtual University of Pakistan

  2. I R RInternal Rate of Return Virtual University of Pakistan

  3. What is IRR ? • The discount rate often used in capital budgeting that makes the net present value of all cash flows from a particular project equal to zero. • Generally speaking, the higher a project's internal rate of return, the more desirable it is to undertake the project. • As such, IRR can be used to rank several prospective projects a firm is considering. Assuming all other factors are equal among the various projects, the project with the highest IRR would probably be considered the best and undertaken first. • IRR is sometimes referred to as “Economic Rate of Return (ERR)". Virtual University of Pakistan

  4. FINDING IRR(Trial & Error Method with Interpolation Formula) • A project involves an initial outlay of Rs. 240,000. The estimated net cash flows for the project are as given: • The company’s required rate of return is 13 percent. • Calculate the IRR for the project. Is the project feasible assuming all other factors are equal ? Virtual University of Pakistan

  5. Trial & Error Method(By applying different discount rates) At 15 % discount rate: NPV = - 240,000+[140,000/(1.15)]+[80,000/(1.15)2]+[60,000/(1.15)3]+[20,000/(1.15)4]+[20,000/(1.15)5] = - 240,000 + 121,739 + 60,491 + 39,450 + 11,435 + 9,944 = - 240,000 + 243,059 = Rs. 3,059 At 17 % discount rate: NPV = - 240,000+[140,000/(1.17)]+[80,000/(1.17)2]+[60,000/(1.17)3]+[20,000/(1.17)4]+[20,000/(1.17)5] = - 240,000 + 119,658 + 58,441 + 37,463 + 10,673 + 9,122 = - 240,000 + 235,357 = Rs. – 4,643 Virtual University of Pakistan

  6. Finding By using 15% rate we have a positive figure that is greater than zero whereas by using 17% rate we have a negative figure that is lesser than zero. NPV appears to be zero between 15% and 17%, so IRR is somewhere in that range. By using INTERPOLATION Technique or Formula, we can find that the IRR is about 15.79%. Virtual University of Pakistan

  7. 0.15 Rs.3,059 IRR 0 0.17 -Rs.4,643 X Rs.3,059 .02 Rs.7,702 Interpolation Technique(For Finding IRR) NPV Rate Rs.3,059 X 0.02 Rs.7,702 =

  8. Interpolation Technique(For Finding IRR) IRR = Lower Rate + X IRR = 0.15 + 0.0079 IRR = 0.1579 or 15.79% X Virtual University of Pakistan

  9. OR Virtual University of Pakistan

  10. Interpolation Formula(For Finding IRR) IRR = Lower discount Rate + Difference between the two discount rates x (NPV at lower discounted rate / absolute difference between the NPVs of the two discount rates) = 15 + ( 17 – 15 ) x ( 3,059 / (3,059 – ( - 4643 )) = 15 + 2 x ( 3,059 / 7,702 ) = 15 + 2 x 0.3972 = 15 + 0.7944 IRR = 15.79 % Approx. Virtual University of Pakistan

  11. Now Applying 15.79%, We have NPV nearer to Zero NPV = -240,000+[140,000/(1.1579)]+[80,000/(1.1579)2] +[60,000/(1.1579)3]+[20,000/(1.1579)4]+[20,000/(1.1579)5] = - 240,000 + 120,909 + 59,669 + 38,649 + 11,126 + 9,609 = - 240,000 + 239,962 NPV = Rs. 38  Nearer to Zero Virtual University of Pakistan

  12. Project Feasibility The project is feasible as its Internal Rate of Return (IRR) is greater than the company’s required rate of return, assuming all other factors are equal*. *( If there are two mutually exclusive projects and both have IRR greater than the company’s required rate of return then the project with higher NPV will be preferred. In other words, other capital budgeting techniques will be employed. ) Virtual University of Pakistan

  13. Dear Students ! It is hoped that….. You’d be now able to find out IRR easily. . . . GOOD LUCK . . . Instructor FIN622 Virtual University of Pakistan Virtual University of Pakistan