Global Aggregation. Mod 34.09 raised by ESB CS at Mods Meeting 24 (29.09.09). Draft of Option E version circulated in mid August. Revised version submitted formally on September 1st. 2. Global Aggregation. Drafting allows for Error Supplier Unit as required by Licence.
E N D
Global Aggregation • Mod 34.09 raised by ESB CS at Mods Meeting 24 (29.09.09) • Draft of Option E version circulated in mid August • Revised version submitted formally on September 1st 2
Global Aggregation • Drafting allows for Error Supplier Unit as required by Licence • Means where Error Supplier Unit exists, option E rules do not impact • Allows for implementations in each jurisdiction to progress separately 3
Global Aggregation • Adopts the section 7 algebra for the calculation of values • Calculation of Residual Error Volume is the same calculation, with the inclusion of the Error Supplier Unit volumes. 4
Global Aggregation • Calculations of AINDeh and ANINDeh explicitly defined in the modification • This is done to facilitate publication of these values in the PIR. 5
Global Aggregation • Changes from draft – • explicit calculation of AIND/ANIND • Renaming of IEP to NIEP • Specification of NDA as distinct variable means Participants can see demand value as separate item from Participant portion of Residual Error Volume . 6
Global Aggregation • For inclusion in PIR • Non-Interval Energy Proportion • Net Demand Adjustment (NDAvh) • Loss-Adjusted Settlement Net Demand (SNDLFvh) • Aggregate Interval Net Demand (AINDeh) • Aggregate Non Interval Net Demand (ANINDeh) 7