1 / 10

PWG-LF analysis: e xperience and requests

PWG-LF analysis: e xperience and requests. Domenico Elia (INFN Bari ) for the PWG-LF. Outline. Physics Analysis G roups in PWG-LF : Global Event Observables $ ALICE_ROOT/PWGLF /FORWARD $ALICE_ROOT/ PWGPP/EVCHAR Spectra $ALICE_ROOT/PWGLF/SPECTRA

arnie
Download Presentation

PWG-LF analysis: e xperience and requests

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PWG-LF analysis: experience and requests Domenico Elia (INFN Bari) for the PWG-LF Offline week / 7.3.2012

  2. Outline • Physics Analysis Groups in PWG-LF: • Global EventObservables$ALICE_ROOT/PWGLF/FORWARD $ALICE_ROOT/PWGPP/EVCHAR • Spectra$ALICE_ROOT/PWGLF/SPECTRA • Strangeness$ALICE_ROOT/PWGLF/STRANGENESS • Resonances$ALICE_ROOT/PWGLF/RESONANCES • User feedback: • ESD vs AOD basedanalysis (multistrange, V0 in PbPb) • analysisoperations (all): • running on CAF and GRID • LEGO trains (to be first used for PbPb 2010 AODs) • productions (ongoing, nextrequests) Offline week / 7.3.2012

  3. ESD vs AOD analysis • Lambda/K0s PbPbanalysis “strategy”: • getmainspectra out of ESDs (nearlydone) • runningalmost 100% on the GRID • plan to use AODs for systematicsstudies • ESD vs AOD validationongoing (almost OK) Offline week / 7.3.2012

  4. ESD vs AOD analysis • MultistrangePbPbexperience: • wholeanalysisdone on ESDs up to SQM • starteddeveloping code for AODscouple of months ago: • speed-up running over full statistics • V0 and Cascadevertexing re-done (looser cosV0PA cut) in AODs • running on GRID indeedmuchfasteron AODs: • factor 10 gain wrtESDs • about 100% runningefficiency (80% with EDSs) • AOD related bug spottedrunning on CAF (SB #91071): • due to a change in ROOT default behaviour • made running on AODsextremely slow • shouldalsoinfluencerunning on ESDs • solved by Andrei last Friday (fix in the next AN tag) • temporarysolution: add in UseCreateOutputObjects() • gROOT->SetMustClean(kFALSE); Offline week / 7.3.2012

  5. Analysis operations • Running on CAF: • generallylimited to fast checks on the code • staging of datasetsalwaysdonequickly (thanks to AAF admins) • no special issuesreported • Running on GRID: • lower performance up to end 2011: • jobswaiting in queues, high fractionending in erroretc • mergingpainful(problems with many SE …) • muchimproved over the last twomonths: • quiteefficientrunning • muchfastermerging (impressive) • merginglocally (to be tried via JDL) • few GRID powerusers Offline week / 7.3.2012

  6. Analysis operations • LEGO trains: • usage/advantagesdiscussedat the last PWG meeting: • triggereddiscussions in allPAGs • first trains just approved (PbPb 2010 AOD strangenessanalysis) Thanks to JanFiete! Offline week / 7.3.2012

  7. Productions • PbPb 2010 AOD re-production (ST #24646): • status: ongoing (data AODsdone, MC to be done) • requiredbecause a new cut for V0 reco (done in ESD filtering) • tookmonths to start: • variousbugs (centrality, slow AOD filteringetc) • further (initiallyunexpected) additions/mods to the code • MC AODs re-prodtestedOK, will go on with: • LHC11a10b_plus (strangenessinjected HIJING, 0-90%) • LHC11f5 (strangenessinjected HIJING, 0-20%) • LHC11a10a_bis (standard HIJING) • expected to be completed in a week • further notes: • LHC11f5 “good” AODsalreadyexist … butmanyrunsmissing • MC anchors: 155 runs, then the list of goodrunschanged •  only 92 of them are good … (1/3 statslost ?) Offline week / 7.3.2012

  8. Productions • PbPb 2010 AOD re-production (ST #24646) • Multistrangeenhanced MC pp@2.76 TeV(ST #25351): • status: ongoing, test jobsvalidated • tookonemonth to start: • need to use pass2-like AliRoot • some work needed to prepare OCDB snapshots … • requested 10 M events (50% Xi and 50% Omega triggeredevts) • expectedto be completed in 2-3 days Offline week / 7.3.2012

  9. Productions • PbPb 2010 AOD re-production (ST #24646) • Multistrangeenhanced MC pp@2.76 TeV(ST #25351) • V0 high pTV0 trigger MC pp@2.76 TeV: • status: request to be submitted • needed for high pTcorrection in V0 analysis • requiresmods in AliGenPythia (SB #92223): • enabletriggering with specificspecieswithin a givenpTwindow • extension of existingAliGenPythia::SetTriggerParticle() • alreadytestedlocally (thanks to David D. Chinellato) • willrequire~ 50 M events (pT > 2 GeV/c) • potentialissue: • need for pass2-like production (oldAliRoot ?) •  how to handleAliRootmods, OCDB snapshotsetc? Offline week / 7.3.2012

  10. Productions • PbPb 2010 AOD re-production (ST #24646) • Multistrangeenhanced MC pp@2.76 TeV(ST #25351) • V0 high pTV0 trigger MC pp@2.76 TeV • PWG-LF production coordinator: • aim to coordinate, help preparing and testing MC requests • first discussedat the last coordination meeting on monday • will be followed up to identify a personverysoon Offline week / 7.3.2012