1 / 18

Status of GridPP

Status of GridPP. Overview Financial Summary Recruitment Status EU DataGrid UK Grid Status GridPP and the e-Science Centres. GridPP Overview. Provide architecture and middleware. Future LHC Experiments. Running US Experiments.

asasia
Download Presentation

Status of GridPP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of GridPP • Overview • Financial Summary • Recruitment Status • EU DataGrid • UK Grid Status • GridPP and the e-Science Centres Grid Steering Committee 8 March 2002

  2. GridPP Overview Provide architecture and middleware Future LHC Experiments Running US Experiments Build prototype Tier-1 and Tier-2s in the UK and implement middleware in experiments Use the Grid with simulation data Use the Grid with real data Grid Steering Committee 8 March 2002

  3. Allocation of GridPP Funds Applications/System Tier-1/A Tier-0 Applications Middleware Grid Steering Committee 8 March 2002

  4. Recruitment • EU Funded Posts (Middleware/Testbed) • All 5 in post + 1 additional from 1/2/02 • EDG Unfunded Posts (Middleware/Testbed) • 13.5 out of 15 in post • (1 under offer, 0.5 starts 1/4/02 + 0.5 from CeSC) • GridPP Posts (Applications + Tier1/A) • Allocated Dec 2001 • ~7 out of 15 ~in post • CERN Posts • First Round > 100 Applicants • 12 Offers, 1 Refusal, 1 Postponed • 3 Fellows, 5 Staff members, 2 UK University Staff • 4 in Applications, 2 Data Management, 3 Systems, 1 Management Grid Steering Committee 8 March 2002

  5. Recruitment Overall: • Initially problems with EU Funded posts at RAL. • Since then no real problems recruiting - mixture of academic and software industry backgrounds. • Delays mainly caused by (University) bureaucracy. Grid Steering Committee 8 March 2002

  6. EU DataGrid • First EU Review of DataGrid completed last week. • Verbal feedback very positive. • Reviewers commended overall good performance. • Several areas above expectations. • All deliverables accepted as they are. • Earlier UK concerns successfully overcome. • UK Contributions • Architectures • Testbed-1 • Network Monitoring • Storage Element • Certificates & Security • R-GMA • LCFG • MDS deployment • Spitfire • … Grid Steering Committee 8 March 2002

  7. LCFG Grid Steering Committee 8 March 2002

  8. Application Code Application Code Archiver Servlet Consumer Servlet Consumer Servlet Consumer Servlet Consumer Servlet Consumer API Archiver API Consumer API Consumer API User code monitors output here. Consumer API Registry API Registry API Registry API Registry API Consumer API DBProducer Registry Servlet Schema API User code here. Builds on R-GMA Database Structures. DBProducer Servlet Registry API ProducerServlet Producer API Schema Servlet Sensor Code “Event Dictionary” R-GMA Relational Grid Monitoring Architecture Grid Steering Committee 8 March 2002

  9. EDG Testbed Status • For EU Review of DataGrid on 1st March a Testbed 1.1 grid of 5 sites was constructed: • CERN, RAL, IN2P3-Lyon, CNAF-Bologna, NIKHEF. • The demos included jobs running at all sites and moving data. • This had the required functionality working but proved unreliable. • An attempt will be made to make it stable in Release 1.1.2 • Then it will be released to more sites • In UK we have a rollout plan that will start then. • Most sites plan to be involved in the GridPP Grid in some way. • Core UK sites at first will be RAL, Bristol, Manchester, IC where we have funded WP6 effort. Grid Steering Committee 8 March 2002

  10. Grid Steering Committee 8 March 2002

  11. Grid Steering Committee 8 March 2002

  12. UK Tier1/A Status Current setup 14 Dual 1GHz PIII, 500MB RAM 40GB disks Compute Element (CE) Storage Element (SE) User Interface (UI) Information Node (IN) Central Facilities (Non Grid) 250 CPUs 10TB Disk 35TB Tape (Capacity 330 TB) Hardware Purchase for delivery in March 156 Dual 1.4GHz 1GB RAM, 30GB disks 26 Disk servers (Dual 1.266GHz) each with 1.9TB disk Expand the capacity of the tape robot by about 35TB Grid Steering Committee 8 March 2002

  13. Tier-2 - ScotGrid • ScotGrid Processing nodes at Glasgow • 59 IBM X Series 330 dual 1 GHz Pentium III with 2GB memory • 2 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory and dual ethernet • 3 IBM X Series 340 dual 1 GHz Pentium III with 2GB memory and 100 + 1000 Mbit/s ethernet • 1TB disk • LTO/Ultrium Tape Library • Cisco ethernet switches • ScotGrid Storage at Edinburgh • IBM X Series 370 PIII Xeon with 512 MB memory 32 x 512 MB RAM • 70 x 73.4 GB IBM FC Hot-Swap HDD • Griddev testrig at Glasgow • 4 x 233 MHz Pentium II • BaBar UltraGrid System at Edinburgh • 4 UltraSparc 80 machines in a rack 450 MHz CPUs in each 4Mb cache, 1 GB memory • Fast Ethernet and MirrorNet switching • CDF equipment at Glasgow • 8 x 700 MHz Xeon IBM xSeries 370 4 GB memory 1 TB disk Grid Steering Committee 8 March 2002

  14. Grid Steering Committee 8 March 2002

  15. Grid Steering Committee 8 March 2002

  16. GridPP & Core e-Science Centres • NeSc • Close ties, hosted 2nd GridPP Collaboration Meeting, Collaboration on EDIKT Project? Training... • Belfast • Replied but not yet up and running. • Cambridge • Close ties, hosted 3rd GridPP Collaboration Meeting. Share one post with GridPP. Will collaborate on ATLAS Data Challenges. • Cardiff • Replied - contacts through QM (Vista) and Brunel GridPP Group. Written formally to all e-Science centres inviting contact and collaboration with GridPP. Grid Steering Committee 8 March 2002

  17. GridPP & Core e-Science Centres • London • No formal reply but close contacts through IC HEP Group. IC will host 5th GridPP Collaboration Meeting. • Manchester • No reply. Manchester HEP Group will host 4th GridPP Collaboration Meeting. • Newcastle • In contact - Database projects? • Oxford • Close ties, collaboration between Oxford HEP Group and GridPP on establishment of central Tier-2 centre? CS/Core-GridPP-EDG links? Probably host 6th GridPP Collaboration Meeting. • Southampton • Replied but no collaboration as yet. Grid Steering Committee 8 March 2002

  18. OGSA Summary • GridPP Project up and running • EDG Middleware development well underway • Recruitment ~ complete • 1st EU Review successful • EDG Testbed 1 being rolled out • UK in 1st rollout • Now extend to several UK sites • Application Development • Just starting • Recruitment underway • 1st US tests successful • UK Grid • 1st Procurement for RAL Tier-1/A underway • Tier-2s developing • Core e-Science Centres • Good relationships evolving Grid Steering Committee 8 March 2002

More Related