Bait Preparation Improvement System Progress Report II ENGR 232: Design and Communications II Department of Engineering

Bait Preparation Improvement System Progress Report II ENGR 232: Design and Communications II Department of Engineering St. Francis Xavier University March 12, 2012 Jeffrey Grover , Alex MacDonald, Alex Scales, Michael Myers, Jessica MacInnis. Progress. Mechanism Design Completed

ash
Download Presentation

Bait Preparation Improvement System Progress Report II ENGR 232: Design and Communications II Department of Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bait Preparation Improvement System Progress Report II ENGR 232: Design and Communications II Department of Engineering St. Francis Xavier University March 12, 2012 Jeffrey Grover , Alex MacDonald, Alex Scales, Michael Myers, Jessica MacInnis

  2. Progress • Mechanism Design Completed • Base Design Completed • Funnel Design Completed • Push Ram Design Complete • Material Acquisitions • Mechanism Acquired/Partially Constructed • Push Ram Partially Constructed • Base Constructed • Funnel Constructed • Blade/Plate Design

  3. The Mechanism/ Push Ram • Bearing Attached • Set Screws Installed • Rack Cut • Push Ram cut Modifications: • Extra Pillow Block • Different Delrin Pattern

  4. The Base • Plywood Construction • Shatter-Resistant Glass Cover for Base • Safety • Weather Resistance Modifications: • Added Rack Guide With Teflon

  5. Funnel • Sheet Metal Construction • Flat-Back Design Modification: • Non-Angled • Funnel Hole-Size Change

  6. Blades and Plates • Blades Constructed • Blades Sharpened • Plates Constructed Modifications: • Plate Grooves • Blade Shortening

  7. After Progress Report I

  8. After Progress Report 2

  9. Before Final Report • Lever -Arm Length - Engineering Analysis • Cost Table (Actual Project vs. Mass Production) • Complete Design • Final Modifications • Complete Construction • Final Report