120 likes | 308 Views
RAKER BTMP. Berlian Resort, Sindanglaya Puncak 15-16 Desember 2009. Project Kegiatan MP 2010. DIPA KOMPONEN MB DIPA BUS GANDENG DIPA RB PUNA PNBP (PENGUJIAN) : R83, BIODIESEL PERTAMINA, AIR QUALITY-JARI, R49 & R24, UJI ENGINE & GENSET, & UJI SEPEDA MOTOR SISTEM MUTU ISO 17025
E N D
RAKER BTMP Berlian Resort, Sindanglaya Puncak 15-16 Desember 2009
Project Kegiatan MP 2010 • DIPA KOMPONEN MB • DIPA BUS GANDENG • DIPA RB PUNA • PNBP (PENGUJIAN) : • R83, BIODIESEL PERTAMINA, AIR QUALITY-JARI, R49 & R24, UJI ENGINE & GENSET, & UJI SEPEDA MOTOR • SISTEM MUTU ISO 17025 • IN HOUSE RESEARCH : IDENTIF & DESAIN SIST TC (PLC,DATA AKUSISI) • PROG INTERNAL TRAINING • PUSAT DESIGN OTOMOTIF
Detail In House Research MP • Identifikasi & Desain TC (Dyno, data akusisi) • Sasaran : Identifikasi dan Desain TC sistem (Dyno, Data akusisi) • Periode : 1 tahun. • Output : Detail Desain PLC
Project Kegiatan TPK 2010 • DIPA ABSORPSI (WBS) • DIPA (MEPPO) D,R & O SIST OTOM IND BAJA (WP) • IN HOUSE RESEARCH : RETROFIT BIOFUEL PADA BURNER • REKONDISI LOOP 1-2 • REVITALISASI INDUSTRI GULA (CE)
Project Kegiatan ST 2010 • OPERASIONAL ; PERSIAPAN KEGIATAN PNBP • PERAWATAN : FASILITAS UJI BTMP • PENGEMBANGAN : ALAT UJI AC, PENAMB ALAT DI MP
Project Kegiatan KPT 2010 • MENUNJANG KALIB PERALATAN UJI BTMP • PNBP (KALIBRASI SUHU, TEKANAN, FLOW) • IN HOUSE RESEARCH : design wind tunnel kalib velocitymeter
Training (Ekternal & Internal) Lab MP : • Air quality (eksternal-JICA) • Bongkar pasang engine (magang industry) • ISO 17025 • Ketidakpastian (internal) • Pabrikasi (eksternal-BLK) • Perawatan signal • Standard uji (R24 dll)
On the Job training (lab MP) • Uji Test Cell • Peserta : Yogi, Mohktar, Anis, Heru, Dedi, Henri, Kanon, Agus Wahidin & Agus Wijayanto
Training (Ekternal & Internal) Lab TPK: • ITC Thermography • Desain HE (internal) Umum : • Menulis/report teknis (Indonesia/English) • Bahasa Inggris, spesifik mis negosiasi • Penulisan proposal • Manajemen
Program Manual 2010 (Komponen) • Partner : NEFA • Sasaran : Optimasi & Uji Diesel 8 PK • Target : Simulasi & Pengujian Engine (< 6 bulan)
Industri Baja (Program Internal) • Topik : Design Requirement & Objective Sistem Otomasi Industri baja • Sasaran : Data monitoring proses Industri baja