1 / 12

RAKER BTMP

RAKER BTMP. Berlian Resort, Sindanglaya Puncak 15-16 Desember 2009. Project Kegiatan MP 2010. DIPA KOMPONEN MB DIPA BUS GANDENG DIPA RB PUNA PNBP (PENGUJIAN) : R83, BIODIESEL PERTAMINA, AIR QUALITY-JARI, R49 & R24, UJI ENGINE & GENSET, & UJI SEPEDA MOTOR SISTEM MUTU ISO 17025

asher
Download Presentation

RAKER BTMP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAKER BTMP Berlian Resort, Sindanglaya Puncak 15-16 Desember 2009

  2. Project Kegiatan MP 2010 • DIPA KOMPONEN MB • DIPA BUS GANDENG • DIPA RB PUNA • PNBP (PENGUJIAN) : • R83, BIODIESEL PERTAMINA, AIR QUALITY-JARI, R49 & R24, UJI ENGINE & GENSET, & UJI SEPEDA MOTOR • SISTEM MUTU ISO 17025 • IN HOUSE RESEARCH : IDENTIF & DESAIN SIST TC (PLC,DATA AKUSISI) • PROG INTERNAL TRAINING • PUSAT DESIGN OTOMOTIF

  3. Detail In House Research MP • Identifikasi & Desain TC (Dyno, data akusisi) • Sasaran : Identifikasi dan Desain TC sistem (Dyno, Data akusisi) • Periode : 1 tahun. • Output : Detail Desain PLC

  4. Project Kegiatan TPK 2010 • DIPA ABSORPSI (WBS) • DIPA (MEPPO) D,R & O SIST OTOM IND BAJA (WP) • IN HOUSE RESEARCH : RETROFIT BIOFUEL PADA BURNER • REKONDISI LOOP 1-2 • REVITALISASI INDUSTRI GULA (CE)

  5. Project Kegiatan ST 2010 • OPERASIONAL ; PERSIAPAN KEGIATAN PNBP • PERAWATAN : FASILITAS UJI BTMP • PENGEMBANGAN : ALAT UJI AC, PENAMB ALAT DI MP

  6. Project Kegiatan KPT 2010 • MENUNJANG KALIB PERALATAN UJI BTMP • PNBP (KALIBRASI SUHU, TEKANAN, FLOW) • IN HOUSE RESEARCH : design wind tunnel kalib velocitymeter

  7. Training (Ekternal & Internal) Lab MP : • Air quality (eksternal-JICA) • Bongkar pasang engine (magang industry) • ISO 17025 • Ketidakpastian (internal) • Pabrikasi (eksternal-BLK) • Perawatan signal • Standard uji (R24 dll)

  8. On the Job training (lab MP) • Uji Test Cell • Peserta : Yogi, Mohktar, Anis, Heru, Dedi, Henri, Kanon, Agus Wahidin & Agus Wijayanto

  9. Training (Ekternal & Internal) Lab TPK: • ITC Thermography • Desain HE (internal) Umum : • Menulis/report teknis (Indonesia/English) • Bahasa Inggris, spesifik mis negosiasi • Penulisan proposal • Manajemen

  10. Program Manual 2010 (Komponen) • Partner : NEFA • Sasaran : Optimasi & Uji Diesel 8 PK • Target : Simulasi & Pengujian Engine (< 6 bulan)

  11. Industri Baja (Program Internal) • Topik : Design Requirement & Objective Sistem Otomasi Industri baja • Sasaran : Data monitoring proses Industri baja

More Related