UCH POWER PROJECT

UCH POWER PROJECT. Electric Service. Colonies, jobs. 586 MW. Scope Of The Project. Financers. Dutch and German banks ABN Amro Deutsche Bank NDFC World Bank IFC Bank of China. MARKET SUMMARY. MARKET SUMMARY(80’S &90’s). 81-91 : 9% & 10.9%. 31,500 GWH . 7100 MV:Cpty.

ashley
Download Presentation

UCH POWER PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCH POWER PROJECT

  2. Electric Service Colonies, jobs 586 MW Scope Of The Project

  3. Financers • Dutch and German banks • ABN Amro • Deutsche Bank • NDFC • World Bank • IFC • Bank of China

  4. MARKET SUMMARY

  5. MARKET SUMMARY(80’S &90’s) 81-91 : 9% & 10.9% 31,500 GWH 7100 MV:Cpty Forecasted incr demand : 16,323MV 600 & 800 MV

  6. NEED ANALYSIS Agriculture sector nominal consumer electricity(18.2%) :15.8% in 1987 to 1991 Resources indigenous to Pakistan Avoiding import of foreign fuel:$2 billion

  7. NEED ANALYSIS Demand growth: 9.4% Higher propensity of electricity consumption June 1991: 32% of villages (electricity) GDP growth of 6.4%: 1991-92 Demographic and economic changes

  8. Imported 34% of energy requirements

  9. PROJECT Partners

  10. PARTICIPANTS • California Energy Company Inc • Hawkins Oil & Gas Inc. • Hasan Group • Kiewit Energy Company • Tenaska Inc.

  11. LOCATION • DeraMuradJamali, District Nasirabad, Balochistan

  12. ADVANTAGES OF SELECTED SITE

  13. FUEL SUPPLY Low btu gas from UCH gas field • OGDC is the lease operator of Uch gas field • Per unit price charged by the UCH is

  14. FUEL SUPPLY

  15. FUEL FOR THE START UP & SHUTDOWN • 1500,000 GALLONS • Fuel will be trucked to location

  16. INTERCONNECTION WITH NATIONAL GRID

  17. BENEFITS OF LOW BTU GAS

  18. MACHINES USED

  19. GENERAL BENEFITS Low environmental impacts Low capital costs High thermal efficiency Indigenous fuel

  20. CRITICAL ANALYSIS & CONCLUSION