1 / 34

UPC TEAM

UPC TEAM. UPC TEAM. 1- Sustainable profit-making long-term plan. Google Lunar X Prize. UPC Team. 1- Sustainable profit-making long-term plan. Lunar Base Site Scouting: YES Premium Entertainment Package: YES Personal Glory: No Lunar Communications Architecture: No Martian X Prize: No

ashton
Download Presentation

UPC TEAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UPC TEAM

  2. UPC TEAM 1- Sustainableprofit-makinglong-term plan Google Lunar X Prize UPC Team

  3. 1- Sustainable profit-making long-term plan • Lunar Base Site Scouting: YES • Premium Entertainment Package: YES • Personal Glory: No • Lunar Communications Architecture: No • Martian X Prize: No • Far Side Lunar Observatory: YES • Google Earth 3.0: Explore the whole world in 3D: YES

  4. 1- Sustainableprofit-makinglong-term plan • Lunar Base Site Scouting: YES • Difficult mission but very attractive (it is the end goal of the project). • A human colony is still far from our project. • Lunar payload delivery, lunar mining.

  5. 1- Sustainableprofit-makinglong-term plan • Premium Entertainment Package: YES • Good amount of money to make profit. • Very similar to GLXP initial mission. • Heavy requirement of data adquisition and transmition, and may be a large Rover range.

  6. 1- Sustainableprofit-makinglong-term plan • Personal Glory: NO • Easy mission but... • Non ethical or political correction. • Other personal glories may be better than country flags.

  7. 1- Sustainable profit-making long-term plan • Lunar Communications Architecture: NO • Communication satellites orbiting are needed, and the project does not include anyone. • It might be a huge project for a new company.

  8. 1- Sustainable profit-making long-term plan • Martian X Prize: No, different mission requirements • It is a very difficult mission for 50M$. • The requirements may change a lot. • It could be better to develop projects on the moon.

  9. 1- Sustainable profit-making long-term plan • Far Side Lunar Observatory: YES • It is a good amount of money for setting up a modular network. • Payload mission must be incremented a lot. • Additional contacts may concern a good profit for a long-term.

  10. 1- Sustainable profit-making long-term plan • Google Earth 3.0: Explore the whole world in 3D • It could be included in our first mission, because of the benefit. • The most difficult point is the camera used (not very high requirement).

  11. 1- Sustainable profit-making long-term plan • Other possibilities for profit making: • Possibility to move the Rover by radio control over using Internet from peoples home, and take personal pictures. • Send people’s ashes that wanted to go to the moon and loved it. • Safety place for enterprise data. • Possibility of advertisement in the first GLXP.

  12. UPC TEAM Fund Raising: Getting started to win the GLXP! Google Lunar X Prize UPC Team

  13. WE NEED LOTS OF MONEY… Marketing Marketing Marketing Marketing May, 2008 Google Lunar X Prize UPC Team

  14. Fund Raising To do before… Venture Capitalist (Ownership of our company)  49% Sponsoring of publicity (equipment) Individual donations (minimum) Sponsors: Publicity in our mission May, 2008 Google Lunar X Prize UPC Team

  15. Fund Raising To do after… IPO Long-term-plan actions (already explained) Bonus (Heritage & Range) May, 2008 Google Lunar X Prize UPC Team

  16. UPC TEAM De la Terre à la Lune ! Google Lunar X Prize UPC Team

  17. De la Terre à la Lune ! There are diferents rockets in history, we can choose what is the ideal rocket for launch… But we want a Sustainable Project. • We want an economy launch • Emerging country in space race May, 2008 Google Lunar X Prize UPC Team

  18. De la Terre à la Lune ! Atlas Energy Ariane N-1 Proton Redstone V2 Saturno V Saturno I Titan May, 2008 Google Lunar X Prize UPC Team

  19. De la Terre à la Lune ! Wich is better? Ardiane 5 or Falcon 2x ? May, 2008 Google Lunar X Prize UPC Team

  20. De la Terre à la Lune ! May, 2008 Google Lunar X Prize UPC Team

  21. De la Terre à la Lune ! Payload Go out one Spacecraft May, 2008 Google Lunar X Prize UPC Team

  22. De la Terre à la Lune ! We can arrived at moon in 4 days !!!! • Lunar Transfer Inserche – May, 2008 Google Lunar X Prize UPC Team

  23. De la Terre à la Lune ! When Spacecraft is near start a break with hidrazine N2H4 to… May, 2008 Google Lunar X Prize UPC Team

  24. De la Terre à la Lune ! To…when Spacecraft is near at Moon Surfice leave a TETRAHEDRON With a coated air balls (airbags) May, 2008 Google Lunar X Prize UPC Team

  25. De la Terre à la Lune ! Then… tetrahedron have a crash landing!! BUT CONTROLABLE!!! Bouncnig Effect But where?? May, 2008 Google Lunar X Prize UPC Team

  26. De la Terre à la Lune ! Landing on the Lunar Equator: Advantages • Safer • Earth View • Type of Landing • Solar Power Availability May, 2008 Google Lunar X Prize UPC Team

  27. De la Terre à la Lune ! • Air of balls desapair • Open 3 sides (always open with the correct position) • Robot arm with antennas seeking signs of land - Rover is still anchored on one side May, 2008 Google Lunar X Prize UPC Team

  28. De la Terre à la Lune ! • Tetraedro Open • - 3 antenas • - 1 Parabolic to Earth • - 2 with Rover • Solar Arrays • 3 arms with 2 camaras everyone (for 3D) • Rover • start its mission May, 2008 Google Lunar X Prize UPC Team

  29. De la Terre à la Lune ! • Where • is the rover?? May, 2008 Google Lunar X Prize UPC Team

  30. De la Terre à la Lune ! Rover is RUN!!! • Rover • - Has 2 arms with • 2 antennas • Has Solar Arrays • 6 wires • 2 arms with 2 camaras everyone with 3D May, 2008 Google Lunar X Prize UPC Team

  31. On the Surface of the Moon: Mobility and Mooncast ! Google Lunar X Prize UPC Team

  32. On the Surface of the moon.  Lunar station  Communications between Earth and Moon  Communications between Rover and Lunar station Rover  Moon exploration  Autonomous and Remote Controlled May, 2008 Google Lunar X Prize UPC Team

  33. On the Surface of the moon.  Lunar station  X - Ku Band between Earth & Moon, nearly to 10GHz, CNAF may provide this band. Modulation by C-OFDM maybe is a good option in front of multi-path error, but posterior studies in BER must corroborate it.  Rechargeable Batteries with and small energy plant. Recently technologies provide to Littium-Polimery batteries a high power, and very high discharge peak, however extremely conditions have not been tested.  2 kinds of Communications between Rover and Lunar Station.  Data Instruction Transfer (about 800Mhz). Radio Modem transmission can solve the problem of error and modulation, because provide a full- duplex communication FSK and error detection & correction by Hamming procedure.  Video Transfer 2,4Ghz simple communication where is only receiving video from Rover May, 2008 Google Lunar X Prize UPC Team

  34. On the Surface of the moon.  Rover  Autonomous and Remote Control Available . From Earth and using Data Instruction Transfer is possible change it between mode. If autonomous mode is desired, using artificial vision coming from video cameras, IA (fuzzy and Neural Networks) is able to dote of this system to the rover.  Rechargeable Batteries with solar panel. Recently technologies provide to Littium-Polimery batteries a high power, and very high discharge peak, however extremely conditions have not been tested.  2 kinds of Communications between Rover and Lunar Station.  Data Instruction Transfer  Video Transfer 2,4Ghz (Explained before) May, 2008 Google Lunar X Prize UPC Team

More Related