10 likes | 164 Views
Internet Router. STAGEnet 2006 Video Pre-Migration & Test Plan. Test Locations DCN ATM Test T1 (Local T1 Test, Non-Production) Dickinson DOT ATM T1 (Production T1 Test) Fargo DOT Metro Ethernet (Metro Fiber Test) Pre-Migration Phase (April-June) Perform all test at locations noted above
E N D
Internet Router STAGEnet 2006 Video Pre-Migration & Test Plan Test Locations DCN ATM Test T1 (Local T1 Test, Non-Production) Dickinson DOT ATM T1 (Production T1 Test) Fargo DOT Metro Ethernet (Metro Fiber Test) Pre-Migration Phase (April-June) Perform all test at locations noted above Migrate all Non-K12 locations to their respective data router Configure QoS along all paths as supported by hardware and software. End site configurations will need ACL moved to video outbound interface: (example) Permit 10.233 any Permit any 10.233 H.323 Deny all … Switch Edge Rtr ATM Bundled ATM T1 UBR VBR Use a VLAN crossover cable for VLAN access from the data backbone routers to the MCU VLAN’s. (Shortest Path) Create sub-interface for access to Video Router’s MCU VLAN Segment. Route. Static route to 10.233.0.0. Backbone Router Video Backbone Video Router Switch Switch MCU Segment(s) This represents the State, PSD, LIB/HAN, and HECN switch(s). HECN is for Tribes and UoM. Switch