Georgia’s Experience with Wood Pellet Plants

Georgia’s Experience with Wood Pellet Plants. R4 Enforcement Managers Workshop November 2012. What is a Wood Pellet?. Compacted sawdust Lignin in wood forms the “glue” holding the pellet together after going through the press area (heat and pressure ). Wood Pellets.

audi
Download Presentation

Georgia’s Experience with Wood Pellet Plants

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Georgia’s Experience with Wood Pellet Plants R4 Enforcement Managers Workshop November 2012

  2. What is a Wood Pellet? • Compacted sawdust • Lignin in wood forms the “glue” holding the pellet together after going through the press area (heat and pressure)

  3. Wood Pellets • Manufactured to a specific size and density • Even heating • Facilitate automatic feeding • Moisture content reduced to < l0% • No bark used, so the ash content is low • ~7500 BTU/lb

  4. Wood Pellets • Most wood pellets produced in GA are shipped to Europe • Pellets are used to generate electricity in UK and Netherlands, as well as for home heating

  5. Wood Pellet Industry in Georgia

  6. Wood Pellet Process Diagram PM, VOC & HAP controls Raw material (sawdust/ bark) Heat Energy System Heat Wet chips Raw material (logs) Debarker, Chipper Dryer PM controls Dry chips Hot Pellets Hammermill Pelletizer Cooler Pellet Bagging/ Bulk Loading Flakes

  7. Case Study 1 Plant converted from producing pine shavings for animal bedding to manufacturing wood pellets for European markets. • 40 MM Btu/hour burner provides direct heat to triple pass drum dryer • High efficiency cyclone on triple pass drum dryer recycles product back into the process • Initially permitted with a major source construction permit • Required to conduct performance tests for CO, VOC, PM after startup

  8. Case Study 1 • Performance tests conducted at Facility in August 2009 • Synthetic minor source operating permit was issued • Emission factors developed from August 2009 tests used • Synthetic minor source of VOCs • Permit limited throughput to 59,353 tons of green wood during any 12 consecutive months (equivalent to 33,000 ODT) to limit VOC emissions • PTE for PM and CO determined to be < 100 TPY based on emission factors developed during August 2009 performance test

  9. Case Study 1 • GA EPD’s Industrial Source Monitoring Program conducted VOC, CO, NOx, and opacity testing in November 2011 at Facility • High VE observed from dryer • Noted that combustion control was not sophisticated • Standard industry and EPA emission factors were not available for industry

  10. Case Study 1

  11. Case Study 1 • Notice of Violation (NOV) issued in August 2012 • Cited a violation of 40% opacity limit • Stated that the tests conducted by GA EPD in Nov 2011 indicate potential Title V and PSD violations for CO and VOC • Requested a demonstration of compliance with emission limits or submittal of a PSD application

  12. Case Study 1 • NOV response received in November 2012 and detailed actions taken by Company since November 2011 testing • Added variable speed drive to dryer burner fans and ID fan • Operator training • Redesigned air inlet ducts into burner chamber • Redesigned dryer feed to reduce cold air inflow • NOV response did not include schedule for conducting additional performance tests • NOV response did not include PSD application

  13. Case Study 2 • Greenfield Plant in South Georgia • Plant production rate of 750,000 metric tons per year (826,733 short tons) • Two heat energy systems, each with design capacity of 193 MM Btu/hr • Emissions from heat energy systems and rotary drum dryer are controlled with Wet ESPs and thermal oxidizers • Hammermills and pellet cooler line emissions are controlled with baghouses

  14. Case Study 2 • Permitted as Title V major source and PSD minor source • Synthetic minor limits for formaldehyde and total HAP • Title V major source of PM, VOCs, CO and NOx

  15. Case Study 2

  16. Case Study 2 • Began operating in April 2011 • Conducted testing in October 2011 as required by the Permit • VOCs, NOx, CO, PM, formaldehyde, methanol, acetaldehyde off dryers (as controlled by WESP and thermal oxidizers) • Demonstrated compliance with all emission limits in the Permit

  17. Case Study 2 • Met with GA EPD in June 2012 to self-disclose potential PSD violations • Discovered during engineering testing • VOC emissions significantly higher than projected • Significant amount of VOCs coming from pellet coolers and hammermills (not just the dryers) • Requested time to do additional testing • Additional testing done in July 2012 was received at GA EPD in September 2012 • VOC emissions ~ 1300 TPY

  18. Case Study 2 • Company has submitted a compliance schedule to install two additional thermal oxidizers • Hammermills • Pellet coolers • Plans to remain a PSD minor

  19. Questions? Douglas Waldron Douglas.Waldron@gaepd.org 404-363-7122 Karen Hays Karen.Hays@gaepd.org 404-363-7115