1 / 10

MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD

AMMW2013. MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD. APS. ESRF. SPRING 8. I. LECONTE – P. ROUSSELY – OPERATION Group. AMMW2013. HOW X-RAYs ARE PRODUCED ?. 0.5 MeV. 200 MeV. BOOSTER ( 300m ). 200 MeV  6GeV. LINAC. 200 MeV. 6GeV. STORAGE RING ( 844 m ).

audi
Download Presentation

MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMMW2013 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS ESRF SPRING 8 I. LECONTE – P. ROUSSELY – OPERATION Group

  2. AMMW2013 HOW X-RAYs ARE PRODUCED ? 0.5 MeV 200 MeV BOOSTER ( 300m ) 200 MeV 6GeV LINAC 200 MeV 6GeV STORAGE RING ( 844 m ) I. LECONTE – P. ROUSSELY – OPERATION Group

  3. AMMW2013 Planning 2013 : USM : 231 days - Shutdowns : 80 days - - MDT : 54 days I. LECONTE – P. ROUSSELY – OPERATION Group

  4. AMMW2013 ORGANIZATION : • 620 employees, 18% work for the Machine • Annual budget : 100 M€ • Number of assets : 20 000 • Annual maintenance budget : 13 M€ • Management responsible : For asset & maintenance each group is responsible in close collaboration with the Operation group I. LECONTE – P. ROUSSELY – OPERATION Group

  5. AMMW2013 Tools for operation tracking: • Fast data loggers for quick events • 1 hour buffer 3D trailer I. LECONTE – P. ROUSSELY – OPERATION Group

  6. AMMW2013 Tools for operation tracking: • Historical data base, recalls in the past months and /or years • Jlogbook ( selections by date/events/equipment … ) used daily by the Operator on crew in the Control Room I. LECONTE – P. ROUSSELY – OPERATION Group

  7. AMMW2013 AMM entreprise strategy : • No dedicated tools for the accelerators up to now, • but we plan to develop our Jlogbook in this way • ( Infrastructure group and RF group use CARL master software ) • Our goals are : • Machine availability • Mean Time Between Failures I. LECONTE – P. ROUSSELY – OPERATION Group

  8. AMMW2013 ACCELERATOR'S AVAILABILITY FROM 2008 TO 2013 I. LECONTE – P. ROUSSELY – OPERATION Group

  9. AMMW2013 MEAN TIME BETWEEN FAILURES FROM 2008 TO 2013 I. LECONTE – P. ROUSSELY – OPERATION Group

  10. AMMW2013 THANK YOU FOR YOUR ATTENTION I. LECONTE – P. ROUSSELY – OPERATION Group

More Related