An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BRE: BIM in Wales Dan RossiterBIM Team, BRE Wales26th of September, 2014

  2. Agenda • About me • What is BIM • The Origins of BIM • Egan, Latham, Construction Strategy • BIM Level 2 Requirements • BS1192, BS1192-2 and other documents • BIM in Wales • Welsh Construction Strategy, CLAW Toolkit • How the BRE can help • Education • Certification • Consultancy

  3. About Me

  4. Dan Rossiter ?

  5. What is BIM

  6. What is BIM BETTER INFORMATION MANAGEMENT BIM (Building Information Modelling) • It’s not just 3D CAD • It’s not just a new technology application • It’s not next generation, it here and now! BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them. http://www.bimtaskgroup.org/bim-faqs/

  7. What is BIM?

  8. The Origins of BIM

  9. Latham Report 1994 Egan Report 1998 Accelerating Change 2002 Never Waste A Good Crisis 2009 The Origins of BIM

  10. The Origins of BIM Quiz Time Based on the last eleven years of KPI’s: ~50% What percentage of projects come in on time and no budget? Wolstenholme, 2009

  11. The Origins of BIM Cost BIM was seen as a way to Improve: Carbon

  12. The Origins of BIM “Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous”

  13. “Information is Uncoordinated…”

  14. “Information is ambiguous… or why we need Standards”

  15. “Information may be incomplete…”

  16. “Information is uncoordinated…”

  17. “Information is also geospatially incorrect…”

  18. Construction Strategy 2011 The Origins of BIM • There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament. • Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.

  19. BIS BIM Strategy 2011 The Origins of BIM • The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information.

  20. BIM Level 2 Requirements

  21. BIM Maturity Levels – Strategy Paper 2011 0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism. 1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration. 2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements. 3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.

  22. BS 8541 Series UK Standards for BIM BS1192:2007 PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2014 (COBie)

  23. BIM Industry Documentation PI For BIM (CIC) BIM Protocol (CIC) Uniclass (CPIC) Digital Plan of Work (BIM Task Group) CPIx Online (CPIC) ? ?

  24. BIM in Wales

  25. BIM in Wales Recommendations: • Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015. • A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15. • The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence CEWales BIM Task Group Working Paper 2012

  26. BIM in Wales Key Objectives and Milestones: • Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015. Welsh Construction Procurement Strategy 2013

  27. BIM in Wales Contains: • Introduction • Setting the BIM Scene • Business Case IT Investment • Employer Information Requirements Template • Employer Information Requirements Example • Glossary of Terms • Procurement Guide • BIM and GSL Guide • Collaborative Maturity Assessment Tool • Standards and Protocol Reference The CLAW All Wales BIM Toolkit 2014 (Draft)

  28. How BRE Can Help www.bre.co.uk/BIM

  29. BIM Level 2 Training Course • BIM Foundation Course (AP) Covering BIM processes, procedures, information models, management and collaboration • BIM Level 2 PAS1192-2 Project Information Manager (PIM) Task Information Manager (TIM) • BIM Level 2 PAS1192-2 Project Delivery Manager (PDM)

  30. BIM Level 2 Certification Schemes BRE BIM Certificated Professional Schemes • Task Information Manager • Project Information Manager • Project Delivery Manager BRE BIM Business System Certification Scheme • Audited BIM Capability Assessment

  31. Business Certificate Scheme Benefits • PAS 91 (Working towards UKAS accreditation ) • BRE Certificated • Audited Business Evaluation • Defined Industry Benchmark • Lean Process • Reduced Employers Effort / Cost • Reduced Supply Chain Effort / Cost • Checked by Industry Specialist and Supported by BuildingSMART UKI

  32. BIM Checking Service Documentation • Employers Information Requirements (EIRs) • BIM Execution Plans (BEP) Models (BS 1192:2007. PAS 1192-2:2013, BS 1192-4, BS8541 Series) • Naming Conventions • Spatial Co-ordination • Model Definition • Volume Strategy • Level of Definitions • Data Segregation • Annotations & symbology

  33. Summary • About me • What is BIM • The Origins of BIM • Egan, Latham, Construction Strategy • BIM Level 2 Requirements • BS1192, BS1192-2 and other documents • BIM in Wales • Welsh Construction Strategy, CLAW Toolkit • How the BRE can help • Education • Certification • Consultancy

  34. Any Questions? Dan Rossiter BIM Consulting / Training Manager RossiterD@bre.co.uk