An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. جامعة النجاح الوطنية كلية الهندسة قسم هندسة البناء عرض ومناقشة مشروع تخرج لنيل درجة البكالوريوس في هندسة البناء Design of a Commercial Building in Nablus إشراف الدكتور منذر دويكات إعداد وتقديم ضياء فواز علي جدو معاذ ماهر مدني

  2. Outline : • Introduction. • Architectural Drawing and environmental consideration • Preliminary Structural Design. • Three Dimensional Structural Analysis and Design. • Mechanical Design. • Electrical Design.

  3. مخطط الموقع العام

  4. تعريف عام بالمشروع • مجمع ال نمر التجاري • تابع لوزارة الاوقاف و الشؤون الدينية. • يتكون المجمع من 8 طوابق. • بالإضافه إلى طابقين تسويه على مسطح 400 متر مربع. • يحتوي على محلات تجارية في الطابق الارضي والاول. • مطعم في الطابق الثاني. • كذلك يشتمل هذا المجمع على مكاتب . • عيادات متعددة الاغراض.

  5. التعديلات المعمارية الواجهة الجنوبية الواجهة الشمالية تم تغيير مدخل المبنى من الجهة الشمالية إلى الجهة الجنوبية.

  6. التصميم البيئي استخدم المدخة الشمسية في الواجهة الشرقية

  7. التصميم البيئي المعماري التقليل من المساحات الزجاجية في الواجهة الشمالية عما هو عليه حيث بلغت نسبت المساحات الزجاجية 45% من المساحة الكلية للوجهة الشمالية، إلى 20 %. وهذا يقلل من الطاقه اللازمة لتدفئة المبنى شتاءا

  8. متطلبات السلامة العامة توفير مخرج الطوارئ بالإضافة إلى المدخل الرئيسي للمبنى.

  9. متطلبات السامة العامة تزويد المبنى بإشارات لمخرج الطوارئ. تزويد أنظمة الإنارة مخرج الطوارئ ببطاريات تعمل عند حدوث انقطاع التيار الكهربائي تلقائيا.

  10. نظام إطفاء الحريق • انظمة الانذار عند حدوث الحريق: • مركزي أو محلي ويتم تشغيل النطام (اوتوماتيكي أو يدوي) • انظمة الاطفاء عند حدوث الحريق: • يوجد نطامين للحماية من الحريق • أولا النطام اليدوي : الطفيات اليدوية ، خراطيم المياه . • ثانيا النطام الاوتوماتيكي : الرشاشات (ويكون حساس للحراره ) .

  11. Structural Design

  12. Materials Structural materials • Concrete: Concrete strength for all concrete parts is B300 ( f’c = 250 Kg\cm2) Modulus of elasticity equals (2.5*105 Kg\cm2) Unit weight is (2500 kg\m3) • Steel: Modulus of elasticity equals( 2*106 Kg\cm2) For steel reinforcement, is( 4200 Kg\cm2) Non-structural materials They are mainly, blocks, plasters, tiles, filling, mortar and masonry.

  13. Codes and Standards The following codes and standards are used in this study: • ACI 318-08 : American Concrete Institute provisions for reinforced concrete structural design. • UBC-97 : Uniform Building Code provisions for seismic load parametersdetermination. • IBC-2009 : International Building Code, which is used here for live loads.

  14. Loads and Load combinations Loads 1) Gravity loads: Live load: For Basement – second Floor = 0.5 t/m2 For Third – Eighth Floor = 0.3 t/m2 Dead load: . The super imposed dead load = 0.4 t/m2.

  15. 2) Lateral loads: Seismic loads: The UBC97 code seismic parameters are as follows: • The seismic zone factor, Z= 0.2 . • The importance factor, I = 1.0 . • The ductility factor, R = 5.5 . • The seismic coefficient, Ca = 0.18 . • The seismic coefficient, Cv= 0.25 .

  16. Load combinations: The ACI318-08 load combinations are used and they are summarized as follows: • U1 = 1.4D • U2 = 1.2D + 1.6L + 1.6H • U3 = 1.2D + 1.0E + 1.0L • U4 = 0.9D + 1.0E + 1.6H Where: D : is dead load L : is live load H : is weight and pressure load of soil E : is earthquake load

  17. hmin = l/21 = 640/21 = 30.5 cm  Use h=30 cm Ribbed slab analysis and design : • The thickness of the slab:

  18. Dimension of Beam:

  19. Dimension of columns:

  20. Structural Analysis and Design • 3D model . • Dynamic analysis . • Soil springs structure interaction.

  21. Property/Stiffness Modification Factors • Basic calculations

  22. Check Compatibility

  23. Structural Model Verification : • Check Equilibrium • Error % < 5% ok.

  24. Check the moments on the beams :

  25. Check the loads on columns:

  26. Design of slabs Design of slabs :

  27. *Analysis and Design of Beams:

  28. Design of columns

  29. Analysis and Design of Footings • Total Area of plan 400 meter square . • Total load of building about 10000 ton. • Allowable bearing capacity 1.5 Kg\cm2. • After improving the soil under footing using base coarse the allowable bearing capacity become 2.1 Kg\cm. • To carry this load with less deferential settlement we use mat foundation. صورة توضح نوعية التربة 50 cm 50 cm

  30. Design of Footings

  31. Design of Footings • Reinforcement in long direction.

  32. Design of Footings • Reinforcement in short direction.

  33. Design of Footings • Section in mat foundation:

  34. Mechanical Design. Main pipe from Municipality

  35. Mechanical Design. Drainage system and potable water for basement.

  36. Mechanical Design. Drainage system and potable water for bath room men & women.

  37. Mechanical Design. Drainage system and potable water for 3-8 floor (office floor).

  38. Electrical Design Sample calculation for office 1 : For calculate number of lamps in offices use the follow laws : , Ku= 23.5\ 2.75(5.5+4.26) = 0.87 3 .= N= (23.5 * 300 )\ 2 * 0.47 * 0.9 * 2800

  39. Distribution lamps

  40. Distribution socket's

  41. Panel (DB ) :

  42. Thanks for listening