1 / 13

Arthur Handman Executive Director, Greater Hartford Transit District

WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS. Roadway and Railway Transit Perspective. Arthur Handman Executive Director, Greater Hartford Transit District. OVERVIEW. Weather Information Needs / Requirements Results. PRECIPITATION THUNDERSTORMS / LIGHTNING TEMPERATURES VISIBILITY

aulani
Download Presentation

Arthur Handman Executive Director, Greater Hartford Transit District

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Roadway and Railway Transit Perspective Arthur Handman Executive Director, Greater Hartford Transit District

  2. OVERVIEW Weather Information Needs / Requirements Results • PRECIPITATION • THUNDERSTORMS / LIGHTNING • TEMPERATURES • VISIBILITY • WINDS • POLLUTION

  3. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Precipitation • Frozen Precipitation - General ConditionAction*Lead-time • Frozen Precipitation Maintain safe Operator's transportation. Discretion • Freezing Rain/Icing Clear tracks and 2-hrs power rails/wires. • Inclement weather Bus schedules 1-2 hrs leading to early altered. release of commuters • Snowfall/Drifting snow Mobilize staff. 24 hrs (optimum) Stage equipment. 8-hrs (minimum) *Accumulation and lead-time affect the decision process

  4. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Precipitation • Frozen Precipitation - Specific Condition(Preparation)Action*Lead-time • Snowfall 0-2" Mobilize staff. Stage 24-hrs equipment. 8-hrs min. • Snowfall 2-6" Initiate appropriate action 12-hrs plan. • Snowfall 6-8" Initiate appropriate action 12-hrs plan. • Snowfall > 8" Initiate appropriate action 12-hrs plan. *Accumulation and lead-time affect the decision process

  5. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Precipitation • Frozen Precipitation - Specific Condition(Execution)Action*Lead-time • Snowfall 0-2" Mobilize staff. Stage 24-hrs equipment. Maintain Ops. 8-hrs min. • Snowfall 2-6" Maintain Ops. HOV Real-time. restrictions removed. • Snowfall 6-8" Maintain Ops. Bus service Real-time. on snow emergency routes. • Snowfall > 8" Reduced operations. Snow Real-time. emergency routes. Suspend operations. *Accumulation and lead-time affect the decision process

  6. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Precipitation • Liquid Precipitation - General ConditionActionLead-time • Heavy showers Speed reductions Operator's based on precipitation. Discretion • Heavy precipitation Maintenance checks for Operator's roadbed washout. Discretion • Flooding Warn bus drivers. Change Minimal routes. Adjust schedules.

  7. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Precipitation • Liquid Precipitation - Specific ConditionActionLead-time • Flooding Alter or delay rail schedule. 1-hr Check pumps in flood prone areas (railway).

  8. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Thunderstorms / Lightning • General ConditionActionLead-time • Severe Thunderstorm Delay routes. Adjust Operator's schedules. Discretion • Lightning Cease refueling operations. Operator's Discretion

  9. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Temperatures • Air Temperature ConditionActionLead-time > 85 deg F Catenary problems Operator’s in older railway Discretion installations--reduce speed > 85 deg F Monitor personnel and 6-12hrs equipment stress, crew comfort and safety. < 32 deg F Monitor personnel and 6-12hrs equipment stress, crew comfort and safety. < 40 deg F Transport homeless to 12-24hrs shelters.

  10. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Temperatures • Pavement Temperature - Precipitation Imminent ConditionAction > 32 deg F No maintenance action. 30-32 deg F & wet Apply liquid or solid chemical. 25-30 deg F & dry Apply liquid or pre-wetted chemical. 25-30 deg F & wet Apply liquid or solid chemical. 15-25 deg F Apply pre-wetted solid chemical. < 15 deg F Apply abrasives. Plow as needed.

  11. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Visibility • Type of obscuration to vision (fog, smoke, haze, glare) is not important. ConditionActionLead-time <1 mile Rail speed reductions. Operator's (depends on speed and Discretion length of train). < 1/4 mile Bus speed reductions. Operator's Discretion < 1 mile Initiate alerts/warnings Operator's (VMS, etc). Discretion

  12. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Winds • General ConditionActionLead-time Blown debris Clear routes. Delay Operator's operations. Discretion 60-65 mph Bus operations Operator's suspended. Discretion

  13. WEATHER INFORMATION NEEDS / REQUIREMENTS RESULTS Pollution • General ConditionActionLead-time Unhealthy Ozone Action Bus fare reduction. 24-hrs Days/Air Quality Indices

More Related