90 likes | 232 Views
DBM MEETING INTERFACES ON DETECTOR ROUTING, DESIGN AND ASSEMBLY SEQUENCES Sébastien MICHAL September 28 st 2011. nSQP OVERVIEW. DBM LOCATION: nSQP C3-4. PP1 END PLATE. BCM. DBM. DBM SERVICES INVENTORY. 1 Cooling loop 1 feeding line 1 exhaust line SIGNAL: (to the IBL optobox)
E N D
DBM MEETING INTERFACES ON DETECTOR ROUTING, DESIGN AND ASSEMBLY SEQUENCES Sébastien MICHAL September 28st 2011
nSQP OVERVIEW • DBM LOCATION: nSQP C3-4 PP1 END PLATE BCM DBM
DBM SERVICES INVENTORY • 1 Cooling loop • 1 feeding line • 1 exhaust line • SIGNAL: (to the IBL optobox) • 16 AWG28 CCA TP (DTO) • 16 AWG36 Copper TP (CLK / CMD) • 2 AWG36 Copper TP (REF) • POWER: (to the IBL AXON) • 40 AWG22 CCA SINGLE (PWR / SENSE) • 12 AWG36 Copper TP (DCS) 2 bundles 4 bundles
DBM SERVICES • 2 SIGNALS BUNDLES nSQP C3 • 4 POWER BUNDLES nSQP C4 PP1 END PLATE DBM COOLING LOCATION 2 x SIGNAL 8 AWG28 TP 9 AWG36 TP L~5.5 m Ø 5 mm PIPES RUNNING ALONG THE nSQP BACKBONE C 3 nSQP 34 C 4 4 x POWER 10 AWG22 S 3 AWG36 TP L~ 4 m Ø 5 mm PP1 END PLATE DBM CABLES LOCATION Viewfrom C side
DBM COOLING • FITTINGS LOCATION OUTLET BOILER CAPILLARY COOLING FITTINGS PIPES RUNNING ALONG THE nSQP BACKBONE
DBM COOLING INTERFACE • FITTINGS LOCATION From IP From IP BPSS PLATE
DBM SERVICES • BPSS INTERFACE 2 SIGNAL BUNDLES ISP BOTTOM PANEL CABLE BOARD 2/3 SIGNAL BOARD 1/3 4 POWER BUNDLES SIGNAL BOARD 4/6 CABLE BOARD 1/8 CABLE BOARD 6/7 IST BPSS
DBM SERVICES • ASSEMBLY PROCEDURE • Fix supports on BPSS • Install DBM • Fix boiling chanel • Install nSQP on BPSS (with DBM bundles routed on PP1 end plate and corrugated panels) • Install and fix cables boards and signals boards on BPSS
CONCLUSION • REMAINING ENGINEERING TASKS • Support structures for both cable boards and signal boards (CERN) • Cable organiser to route the services on the ISP bottom panels and on the BPSS (CERN) • Thermal coupling between pipe and telescopes (TORONTO) • Flexes to connect sensors to cable / signal boards ? • Signal and power bundles design (CERN)