1 / 17

CAR

CAR. CONTRACTORS’ ALL RISKS INSURANCE Rohana Alagiyage. Part I – Basic Policy Form Part II – Standstill Insurance. CAR Vs EAR. EAR- Erection All Risk Determining factor- Value of Erection & Installation works Less than 50% - CAR Above 50% - EAR. SUBJECT MATTER INSURED.

avon
Download Presentation

CAR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CAR CONTRACTORS’ ALL RISKS INSURANCE Rohana Alagiyage

  2. Part I – Basic Policy Form Part II – Standstill Insurance

  3. CAR Vs EAR EAR- Erection All Risk Determining factor- Value of Erection & Installation works Less than 50% - CAR Above 50% - EAR

  4. SUBJECT MATTER INSURED CAR may be taken out for all building and civil engineering projects, such as: • Residential and office buildings, hospitals, schools, theatres • Production facilities • Infrastructure facilities, airports • Bridges, dams, tunnels and harbors (wet works)

  5. INSURED PARTIES - Jointly CAR insurance should be concluded for all parties concerned to avoid overlaps or gaps in cover: • The principal (employer) &/or • The main contractor &/or • Subcontractors &/or* • Project managers &/or • Suppliers, if any*. * Un-named

  6. SCOPE OF COVER – Two Sections SECTION 1- Material Damage to: • Contract works (permanent and temporary works forming part of the contract) • Removable of debris • Professional Fees • Free issue materials • Construction Equipment ( Site offices, storage sheds, silos, scaffolding, utilities etc) • Construction machinery (earthmoving equipment, cranes, site vehicles) • Principal’s existing property SECTION 2 - Third party liability: • Bodily injury & Property Damage

  7. SECTION 1- Material Damage Cover on ALL RISK basis against unforeseen and sudden physical loss or damage to the insured property from ANY cause other than those specifically excluded

  8. SECTION 2 Where the Insured becomes legally liable to pay as damages consequent upon : • Accidental bodily injury to third parties • Accidental loss or damages to property owned by third party. Occurring in direct connection with construction works insured under Section 1

  9. SCOPE OF COVER - Cont General Exclusions: • Political risks, war or warlike operations, SRCC • Nuclear, radioactive contamination • Willful act or willful negligence of the insured or their representatives • Cessation of work whether total or partial

  10. SCOPE OF COVER - Cont Special Exclusions to section I: • Consequential loss of any kind • Faulty design • Defective material / workmanship (faulty part only) • Mechanical and/or electrical breakdown • Wear and tear, corrosion, gradual deterioration • Road vehicles, waterborne vessels and air crafts • Inventory losses

  11. SCOPE OF COVER - Cont Special Exclusions to section II: • Property insured or insurable under Section I • Vibration, removal, weakening of support • Liability for bodily injury to employee/ workmen of insured parties • Liability for damage to property belonging to insured parties • Motor , Marine & Aviation liability • Contractual liability

  12. PERIOD OF COVER

  13. PERIOD OF COVER Cover ATTACHES from • the commencement of work or • after the insured items have been unloaded at site or • the inception date as specified in the policy Whichever is later And TERMINATES when • the completed structure is taken over or • put into service or • the expiry date specified in the policy Whichever is earlier

  14. CALCULATION OF SUM INSURED • SI must be equal to the amount stated in the building contract plus a value of any free issue material Contractually, insured contractor may be required (e.g. Under FIDIC contracts) to include 15% of CV towards costs of rectification, removal of debris and professional fees Separate sums insured for: • Construction machinery and construction plant and equipment (equal to NRV) • Existing property and clearance of debris (Loss limits) • Third party liability – Section II (as per contact conditions)

  15. PRINCIPLE EXTENSIONS TO BASIC CAR COVER Section I: • Strike, Riot and Civil Commotion • Maintenance Visits Vs Extended maintenance • Expediting Expenses • Airfreight expenses • Offsite Storage • Inland Transit • Designer’s Risk • Contracts works taken over or put into service

  16. PRINCIPLE EXTENSIONS TO BASIC CAR COVER Section II: • Cross Liability • TPL cover during maintenance period • Vibration, removal or weakening of support

  17. PART 2