I-75 Beautification NAHBA 2006 Presentation By: John L. Garner
Initial Draft Pilot Project • Project characteristics • 3.257 mile segment of I-75 in Marion County • Signs on west side (southbound) • 32 sign structures • Average spacing of 554 feet • Project goals • 50% reduction in number of structures • Average spacing of 1,000 feet • Enhanced appearance of remaining structures • Landscaping on R/W and at structures
Why did we stop? • Inability to achieve buy-in from all stakeholders • FHWA position that project could not include relocation of signs to nonconforming locations
The New Approach Interstate 75 Highway Beautification Projects
The Concept • Create “beautification zones” along selected areas of I-75. • Design Right of Way landscaping to enhance the appearance of the roadway and blend with surrounding vegetation. • Purchase nonconforming signs which are located within the beautification zone and are incompatible with the project goals. • Purchase “scenic easements” where necessary to prevent reinstallation of signs.
First Steps • Undertake a study of the full corridor to determine focus areas. • Program $3 Million per year over 5 years for the removal of nonconforming signs.
Project Highlights • Landscaping will emphasize native species which require minimal maintenance. • Full compensation will be paid for nonconforming signs removed. • Normal acquisition processes will be followed. • Condemnation may be used as necessary to carry out a project.