1. Enterprise Remote MonitoringCBM+ AG 2 Sept 2009
2. 2 Sept 2009 2 AGENDA ICAS (Ashore & Afloat)
Remote Monitoring
IPARs & ePARs
Commonality & Savings
Where were headed
CBM/RM challenge
3. 2 Sept 2009 3 ICAS Capabilities - Afloat
4. 2 Sept 2009 4
5. 2 Sept 2009 5
6. 2 Sept 2009 6
7. 2 Sept 2009 7
8. 2 Sept 2009 8 Reverse Distance Support Timeline
9. 2 Sept 2009 9 IPAR Expansion / Evolution
10. 2 Sept 2009 10 From Enterprise Level to Data in 3 Clicks
11. 2 Sept 2009 11
12. 2 Sept 2009 12 IPAR / Remote Monitoring Metrics
IPAR Summary
Dec 06 Nov 07
12 System IPARs complete
MPDE, GTM, GTG, AC, HPAC, LPAC, EVAP, RO, Refer, etc
3321 Ship data submittals
High Month: Oct 07: 383
72 Separate Ships
92% ICAS Surf Ships
High Month: Oct 07: 46
707 IPARs were released
High Month: Aug 07 : 101
Business Rules
Currently optimizing process via SWE
Process Metrics presented to SWE BOD
13. 2 Sept 2009 13
14. 2 Sept 2009 14
15. 2 Sept 2009 15 COMMONALITY The Integrated Condition Assessment System (ICAS) is the poster child for Fleet Commonality
Surface Combatants (60/100)
Amphib & Minesweeps (24/34)
Carriers (6/11)
The same ICAS software is utilized on all installations
Enterprise class based system training
Shared logistics costs
Shared system support costs
Shared implementation costs
16. 2 Sept 2009 16 A Cross Platform, Common Solution
17. 2 Sept 2009 17 Where Were Are Headed LCS
Developing Equipment Health Monitoring System to be installed Post
Phase 1 - Data Qualification Engine developed for Main Engines and Generators
Additional auxiliary systems under development
TYCOM, OPNAV N43, LCSRON view CBM as critical for LCS success
DDG 1000
Developing Enterprise Remote Monitoring (eRM) in support of PMS 500
Collaborating with NSWCPH for Combat Systems
CVN
Installed on CVN 70, 72, 73, 74, & 75
Working with PEO Carriers and AIRFOR on full Remote Monitoring implementation
18. 2 Sept 2009 18
19. 2 Sept 2009 19 Navys CBM/RM Challenge