1 / 13

Ring 6 mechanical Qualification

Ring 6 mechanical Qualification. In a nutshell: rel . precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision agreement (Aa-Ka): 30-50µm Problems with the zero-positioning! (circle-ellipse-hole!?! in the graphite). One example:. Circle hole in graphite & bush. Round hole.

ayame
Download Presentation

Ring 6 mechanical Qualification

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (rot.) abs precision agreement (Aa-Ka): 30-50µm Problems with the zero-positioning! (circle-ellipse-hole!?! in the graphite) One example: TEC Meeting July 03

  2. Circle hole in graphite & bush Round hole bush TEC Meeting July 03

  3. Ellipse hole Another focus! TEC Meeting July 03

  4. Ring 4 mechanical qualification • 8 R4 modules from Lyon KA Already measured!  Aachen for crosscheck (Braunschweig yesterday) • To mention : • 4 sensors are within 10µm vs. rot. • 2 sensors are +60µm off vs. rot. • 2 sensors are -60µm off vs. rot. • ?? 4 sensors/plate 4 in the “middle”, 2 “left”, 2 “right” ?? TEC Meeting July 03

  5. pt100 pt100 Module Ring 5 (front-back) stereo normal TEC Meeting July 03

  6. Dummy petal assembly KA-dummy-petal-cooling TASK-FORCE  TEC Meeting July 03

  7. Ready IR Leds IR Leds Detail: bridge IR Leds to inject current to simulate irrad. To investigate cooling at final power consumption! (l=950 & 1050nm) TEC Meeting July 03

  8. Cooling tests in Stra TEC Meeting July 03

  9. R7 • 2 assembled (1 for KA, 1 for Stra) • Mechanics: good, stiff, tolerance Si-graphite ~500µm • 1st run: no problems • All QTC defects found. • leakage current @ 3.6µA (250V) • 2nd run: 1 NEW PINHOLE • leakage current @75µA (250V) • 3rd run: 1 ADD. PINHOLE • Leakage current @ 400µA (250V) TEC Meeting July 03

  10. R7 prototype1 in KA – 1 in Stra 1st run Known shorts Known pinhole 3rd run: Shorts, pinholes: bonds removed 1st run Add. Pinhole (see Tonys talk) 350µA (one strip) 70µA (one strip) 3d run TEC Meeting July 03

  11. Strip defects Strip 19, pinhole pop-up @ run 3 Strip current @340µA QTC short Strip 105 new pinhole In 2nd run QTC pinhole! TEC Meeting July 03

  12. TEC Meeting July 03

  13. R5 irrad hooked to hybridall meas @ -12°C Cosmic run Some hot channels flagged TEC Meeting July 03

More Related