An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bilgaon Micro-Hydel Project AID Austin Project Proposal By Gagan Bhalla

  2. Bilgaon Micro-Hydel Project Summary Info • Located in Bilgaon, Maharashtra. • Purpose: - Provide electricity to two tribal villages (Bilgaon + Maal) - Tribal belt of Narmada valley above submergence area. • Main Benefits - 191 unelectrified adivasi households in Bilgaon. - 1 Ashramshala (residential school) holding 300 students. - Can be extended to Maal village having 160 households. • Added Benefits - Employment (10 jobs). - Community controlled grinding units. - Easier access to drinking water for womenfolk.

  3. Bilgaon Micro-Hydel Project Power Project Sizing • Power Projects classification • Small (1-10 MW) • Mini (100kw-1MW) • Micro (<100kw) • Micro-hydel in India • Estimated potential 15,000 MW. Only 240 MW utilized. • Ideal for hilly areas. Less cost/environmental damage. • Bilgaon: Simultaneous Max estimate 13MW. Designed for 15MW

  4. Bilgaon Micro-Hydel Project Project Players • People’s School of Energy. Experienced in this work. • Funding largely AID based. • Ashramshala. Rs.50,000 –100,000. • Maharashtra Govt. Alternate Energy Dept. Unlikely. • Bijli Samithi General Council represents households. • Village Elder’s committee. Any divisions etc? • Project Implementation Agency (PIA).

  5. Bilgaon Micro-Hydel Project AID Chapters • Approximate Total Budget Outlay: $19,000. • Already approved: AID MD ($3500) AID Ann Arbor ($2500) Ann Arbor may increase by $1000 • AID Austin proposal for $4000-5000

  6. Bilgaon Micro-Hydel Project Estimated Project Cost (Rs) Weir & intake -> 75,000 Channel & forebay -> 35,000 Anchor blocks -> 10,000 Power house -> 15,000 Penstock -> 2,00,000 Turbine -> 55,000 Generator -> 50,000 Control -> 45,000 Design & supervision -> 15,000 Distribution (approx.) -> 2,00,000 Overheads -> 25,000 Total -> 7,25,000 Extension to Maal -> 2,00,000 Grand Total -> 9,25,000 (Approx $19,000)

  7. Bilgaon Micro-Hydel Project Current Status of Project Work • Bilgaon meeting held on Mar 21. • Work begun:Turbine & Control Panel (2mo) • Procuring Generator in Bangalore. • Shram Daan Starts 2nd week of April. 1.5 months X 40 people. All households. • Notably, “shraam daan” would save Rs. 60,000 @minimum wage (approx $1250)

  8. Bilgaon Micro-Hydel Project Perspectives…… • Mature Players in PIA and PSE. • Already on. 2 chapter already approved. • Innovative and best suited initiative. • AID learning and evolution: • From pedal power to lighting first full village…. • Very solid and exciting achievement…..

  9. Bilgaon Micro-Hydel Project Austin, we have a go…