1 / 24

Route 47 Missouri River Bridge

Route 47 Missouri River Bridge. Bridgescape , LLC. Bridge Typical Section. Committee Design Goals (4/18/2013). Distinctive appearance so that bridge remains a symbol Stay within budget: “German Simple” Recognize views to bridge from downtown/riverfront

azra
Download Presentation

Route 47 Missouri River Bridge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Route 47 Missouri River Bridge Bridgescape, LLC

  2. Bridge Typical Section

  3. Committee Design Goals (4/18/2013) • Distinctive appearance so that bridge remains a symbol • Stay within budget: “German Simple” • Recognize views to bridge from downtown/riverfront • Maintain views to downtown from the bridge • Keep design subtle; historic feel with minimal detailing • Light pedestrian/ bicycle trail but not entire roadway; • Lighting should enhance structure, not draw attention to itself.

  4. Previous Committee Selections: • Variable Depth Girders **** MoDOT Funded • Pier Shape – Gothic Pier ** • One (1) Overlook Located at Pier 7 ** • Railing – 27” Concrete Wall with Vertical Railing Element • Girder Lighting – Girder Wash Fade • Pier Lighting • Overhead Pier Element – Curved Truss w/ Sun Shade • Low Level Trail Lighting

  5. Previous Committee Prioritization:

  6. View from Washington Riverfront Park

  7. View from Washington Riverfront Park

  8. Aerial View of Overlook

  9. Aerial View of Overlook

  10. View from Pedestrian/ Bicycle Trail

  11. View from Pedestrian/ Bicycle Trail

  12. View from Northbound Traffic Lane

  13. View From Northbound Traffic Lane

  14. View from South Approach of Existing Bridge

  15. View from South Approach of Existing Bridge

  16. View from South Approach of Existing Bridge • (w/ East Face Girder Lighting )

  17. View from Trail Below Bridge

  18. View from Trail Below Bridge

  19. Preferred Enhancement Package • Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting

  20. Preferred Enhancement Package $1,355,000 • Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (west face only)

  21. Preferred Enhancement Package $1,355,000 • Decorative Rail + Girder Lighting + Pier Lighting (west face only) • + Overhead Element + Trail Lighting

  22. Preferred Enhancement Package $1,953,000 • Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (east & west face)

  23. Project Schedule • Final Enhancement Commitment August 16, 2013 • Public Hearing (Right-of-Way) October 2013 • Final Enhancement Funds Secured August 2014 • Open Construction Bids September 2016 • New Bridge Open to Traffic Fall 2018 • Project Complete Summer 2019

  24. Thank You for your Participation

More Related