Maximum Feasible Impacts John Davis Mojave Desert and Mountain Recycling Authority
The JPA • Adelanto, Apple Valley, Barstow, Big Bear Lake, Needles, San Bernardino County, Twenty Palms, Victorville, Yucca Valley • Since 1992 • 15,000 =/- square miles • 381,331 people • Board, Technical Committee, Administrator
Victor Valley MRF • Opened in 1995 • Owned by Apple Valley and Victorville • Managed by the JPA • Designed, built, operated by Burrtec • Financed with $6.2 million system revenue bond issue • $2.5 million expansion in 2006
Current MRF • 120 source separated tons per day from JPA members • Public buy back and drop off • 38,400 square feet; 42 employees • CP Manufacturing system • Cardboard pre-sort • V-Screen fiber separation • Fiber sort • Aladdin optical sort for PETE and Aluminum
Materials and Resource Stratgegy • In September 2008, the JPA contracted with Gershman, Brickner & Bratton, Inc., (GBB), in association with RRT Design & Construction, (RRT), to identify increased recycling system performance opportunities
Project Goals • Maximum feasible recycling and composting • Greenhouse gas reduction • Materials management system based on reduction, reuse, recycling, composting and energy recovery • Enhanced collection, MRF processing and marketing
California Public Resources Code • California Public Resources Code Section 40051(b) requires that communities: Maximize the use of all feasible source reduction, recycling, and composting options in order to reduce the amount of solid waste that must be disposed of by transformation and land disposal
California Public Resources Code • Moreover, Section 41783(b) only allows transformation diversion credit (10 percent of the 50 percent required) if: The transformation project uses front-end methods or programs to remove all recyclable materials from the waste stream prior to transformation to the maximum extent feasible
California Public Resources Code • Prior to permitting a new transformation facility the California Integrated Waste Management Board is governed by Section 41783(d), which requires that CIWMB makes both of the following findings, based upon substantial evidence on the record:
California Public Resources Code • (1) The city, county, or regional agency is, and will continue to be, effectively implementing all feasible source reduction, recycling, and composting measures • (2) The transformation project will not adversely affect public health and safety or the environment
California Public Resources Codes • PRC 25741 defines in-state renewable electricity generators, including conversion technologies: To the maximum extent feasible, the technology removes all recyclable materials and marketable green waste compostable materials prior to the conversion process
Project Tasks • Generators • Source Reduction • Collection • Pre-processing • Characterization • MRF Operations Assessment • Energy Recovery • Residue Handling (Landfill)
Victor Valley Materials and Resource Management Strategy Prepared for: Prepared by: GERSHMAN, BRICKNER & BRATTON, INC. and RRT Design & Construction, Inc. April 27, 2009
Recovery Characterization (Chapter 5) • Characterize and identify types and quantities of landfilled waste • Present diversion estimates • 5 day visual characterization at Victorville Landfill (Fall 2008) • 265 “controllable” loads analyzed • Front and side loaders, transfer trailers
Recovery Characterization • Analyzed residential and commercial waste loads received from: • Victorville • Apple Valley • Adelanto • Unincorporated San Bernardino County • Victor Valley MRF
Pre-Processing (Chapter 7) • Identify a system to process material now landfilled, separating and recovering materials for market • Three alternatives • Existing MRF • Modifications to existing • Addition to existing, including transfer station
Pre-Processing Compost Refuse Derived Fuel (RDF) Paper recycling Bottle and can recycling Construction material* Reuse and resale*
Energy Recovery (Chapter 8) • This task characterizes Pre-Processing System residuals for potential energy recovery and identifies potential energy markets for this material
Energy Recovery • Process residual materials with potential for energy recovery would be organic materials that have a low percentage of inert materials and moisture content • Approximately 46 TPD of RDF could be generated through the Pre-Processing System
Energy Recovery • This material would be derived from the plus 9-inch primary trommel overs stream which would transfer across sorting stations for manual removal of OCC, mixed paper, film bags and reject materials
Energy Recovery • Approximately 18 TPD of wood and tree limbs could be removed from the tipping and ground for RDF or compost bulking agent • This could result in a total of approximately 60 to 65 TPD production of RDF fuel feedstock
Energy Recovery • Cement kilns have an interest in using RDF as a fuel to supplement coal for manufacturing Portland cement • The permitting aspect of burning RDF and fuel feed system design requirements were concerns identified by the operators
Scoping Plan Anaerobic Digestion • Anaerobic digestion could assist in meeting 33% renewable energy goal through fuel and energy production • CIWMB will explore incentives to local collection of residential and commercial food scraps for composting and in-vessel anaerobic digestion
Final Report • www.urecycle.org