1 / 11

IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE P802.15 Working Group for Wireless Personal Area Networks. IEEE 802.15.2 WLAN/WPAN Coexistence Task Group Closing Report Dallas, TX. Sponsor Ballot. The sponsor ballot completed on Sunday March 9. Results of the sponsor ballot 66 voters 38 yes 2 no 4 abstain

badrani
Download Presentation

IEEE P802.15 Working Group for Wireless Personal Area Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEEE P802.15 Working Group for Wireless Personal Area Networks IEEE 802.15.2 WLAN/WPAN Coexistence Task Group Closing Report Dallas, TX Steve Shellhammer, Symbol Technologies

  2. Sponsor Ballot • The sponsor ballot completed on Sunday March 9. • Results of the sponsor ballot • 66 voters • 38 yes • 2 no • 4 abstain • 95% affirmative • Return ratio 66% < 75% required • Ballot will be kept open for up to 60 days until we reach a 75% return ratio. Steve Shellhammer, Symbol Technologies

  3. Sponsor Ballot • Ballot stayed open. Current tally • 66 voters • 43 yes • 2 no • 5 abstain • 76% return ratio • 95.6% affirmative • We expect the ballot to close on March 19. • Following pages gives detailed breakdown of voting. Steve Shellhammer, Symbol Technologies

  4. Sponsor Ballot Steve Shellhammer, Symbol Technologies

  5. Sponsor Ballot Steve Shellhammer, Symbol Technologies

  6. Sponsor Ballot Steve Shellhammer, Symbol Technologies

  7. Sponsor Ballot Steve Shellhammer, Symbol Technologies

  8. Sponsor Ballot Steve Shellhammer, Symbol Technologies

  9. Sponsor Ballot Steve Shellhammer, Symbol Technologies

  10. Schedule • Sponsor ballot close on March 19. • Recirculation ballot • Begin on March 24. • End on April 8. • Executive Committee electronic ballot to put TG2 on Rev Com agenda for June • Begin April 9 • End on April 19 (ahead of May 5 deadline) Steve Shellhammer, Symbol Technologies

  11. Motion • Working Group to empower the TG2 ballot review committee to apply edits to draft. • Move Steve Shellhammer • Second David Cypher • Yes • No • Abstain Steve Shellhammer, Symbol Technologies

More Related