Gas-volumes integral certification (updated 16/09/2004). Read-out panels integral assembly (updated 16/09/2004). Setup H8 muon chambers. Endcap. Barrel. BOS. TGCs. MBPL. Magnet. CSC. BIL su supporto rotante. Barrel Stand. BIL on rotating support. BML MDT-RPC BOL MDT-RPC.
E N D
Setup H8 muon chambers Endcap Barrel BOS TGCs MBPL Magnet CSC BIL su supporto rotante
Barrel Stand BIL on rotating support BML MDT-RPC BOL MDT-RPC
H8 Set-up for the muon chambers • Barrel: • 6 MDT (2 BIL, 2 BML, 2 BOL) • FE and 1 MROD • 6 RPC (4 BML, 2 BOL): only ¼ with new PAD trigger and readout boards • 2 more chambers (BIL and a BOS complete station (MDT+RPC) • Endcap • 6 MDT (2 EI, 2 EM, 2 EO) • FE and 1 MROD • 3 TGC • Barrel ed Endcap with the complete allineament system
Status of the MDT-RPC muon station integration at BB5 • June 2004 6 BMLD 2 BOL 1 BOS • 23 Settembre 10 BMLD
MDT-RPC integration plans in 2004 • By Dec 2004 we plan to assembly the following muon stations: 45 BML 12 BMF (Dec 04 installation in the ATLAS pit) 10 BOF/G (Dec 04 installation in the ATLAS pit) 20 BMS This is equivalent to 164 RPC pre-assembly chambers( ~2 RPC units)
Milestones 2005 • 100% RPC units (1016 standard chambers 31/5/2005 • 100% delle unità provate con RC 31/7/2005 • 100% integrated RPC-MDT muon station 30/9/2005