An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Production Cycle PRODUCTION FLOWCHART: PAGE 3 Kevin Ma Steven Radcliff Jie Chen Ernesto Pena Bryan Vien

  2. Narrative The company issues reports at the beginning of the period to check the status of raw materials, finished goods, and the capacity of the production lines. The production schedules are sent to the production department and the material requisitions were approved by the inventory control department; the production takes place. In the meantime, the production schedule is made. After the production is completed, a production status report is created and is sent to the production control department. The completed units are sent to the inventory control department.

  3. Narrative The cost accounting department receives purchase orders, job time cards, and material requisition forms and processes the financial data related to the job order. The journal vouchers are used to update the general ledger to post adjustments. The documents are sent to the management.

  4. Production Flowchart

  5. Production Control Production Department Inventory Control Inventory Status Report Inventory Status Report Factor Availability Report Factor Availability Report Step 1 • Prior to any production, Inventory Control Department and Production Department each performs a routine procedure.

  6. Production Control Production Department Inventory Control Inventory Status Report Inventory Status Report Factor Availability Report Factor Availability Report Step 1 • Inventory Control Department performs a status check on the amount of raw materials and finished goods and then sends the report to Production Control Department. • This is to inform the Production Control Department the amount of available raw materials can go into production, and the amount of finished units can be used to fill customers orders.

  7. Production Control Production Department Inventory Control Inventory Status Report Inventory Status Report Factor Availability Report Factor Availability Report Step 1 • Production Department checks the production capacity and issues a Factor Availability Report and sends it to Production Control Department. • Factor Availability Report – states the available production capacity.  It contains how much resource such as labor, land, capital etc are available.  • With these information, the Production Control Department can make plans to schedule productions, so all orders can be met in time.

  8. Production Flowchart

  9. Production Control Production Department Cost Accounting Production Order 1 Production Order 1 2 Production Order 2 3 N Completed Production Order Step 2 • Production Control Department issues production orders which authorize the unit production. • A copy of the P.O. is sent to Cost Accounting Department. • Another copy of the P.O. is sent to the Production Dept. which authorizes them to produce the order. • The last copy of the P.O. is filed numerically in Production Control Department.

  10. Production Flowchart

  11. Production Control Production Department Inventory Control Cost Accounting Material Req. 1 Material Req. 1 2 2 3 3 4 N Step 3 • Production Control issues material requisition. • Production Control send 3 copies of the Material Requisition to inventory control. • The 4th copy of the Material Requisition is filed numerically in Production Control.

  12. Production Flowchart

  13. Production Control Production Department Inventory Control Cost Accounting Material Req. 1 Material Req. 1 Material Req. 2 2 3 N Step 4 • Inventory Control receives 3 copies of the Material Requisition from Production Control. • 1 copy goes to Cost Accounting. • Another goes to the Production Dept. along with the requested amount of raw materials. • The last copy is filed numerically in Inventory Control to keep track of the inflows and outflows of raw materials

  14. Production Flowchart

  15. Production Control Production Department Production Schedule 1 Production Schedule 1 2 D Step 5 • Production Control sends a copy of the Production Schedule to the Production Dept. This informs the Production Department the scheduled date of completion of that particular order. • The other copy of the Production Schedule is filed in Production Control by date.

  16. Production Flowchart

  17. Inventory Control General Ledger Journal Voucher Journal Voucher Step 6 • Inventory Control creates a Journal Voucher which contains information about the amount of material used in production. And this journal voucher is used to update the general ledger. • Journal Voucher updates general ledger.

  18. Production Flowchart

  19. Production Department Inventory Control Production Order 2 Production Order 2 Completed Production Order 2 Step 7 • This is the actual production process. As the Production Department receives the production order, which is the approval of production from step (2), and the raw material required for production from step (4), the production takes place. • The material requisition form is attached to the production order form, and along with the finished production, they are sent to the Inventory Control Department.

  20. Production Flowchart

  21. Inventory control Cost Accounting Completed Production Order 2 Completed Production Order 2 Step 8 • Inventory Control receives the Completed Production Order along with the Material Requisition from the Production Dept. (7) • a. They post to the inventory records. • Quantity produced • Quantity of material used • b. It is sent to Cost Accounting • i. To summarize production • ii. Record unit cost/total cost/quantity etc.

  22. Production Flowchart

  23. Production Department Cost Accounting Job Time Card Job Time Card Step 9 • 1. The Production Dept. sends the Job Time Cards to Cost Accounting to calculate Labor Costs. • Cost Accounting posts to WIP records. • Direct Labor Cost • Indirect Labor Cost

  24. Production Flowchart

  25. Production Control Production Department Production Status Production Status Step 10 Production Control receives a Production Status Report from the Production Dept.

  26. Production Flowchart

  27. Cost Accounting Post to WIP Records Production Order 1 Step 11 Cost Accounting posts the Production Order to WIP records. The Production order was received from Inventory Control earlier in step (2).

  28. Production Flowchart

  29. Cost Accounting Post to WIP Records Material Req. 1 Step 12 Cost Accounting posts the Material Requisition to WIP records. The Material Requisition was received from Inventory Control in step (4).

  30. Production Flowchart

  31. Cost Accounting General Ledger Journal Voucher Journal Voucher Step 13 • Cost Accounting updates the General Ledger by using a Journal Voucher to record Conversion Costs • = Direct Labor + Manufacturing • Cost Overhead Cost

  32. Production Flowchart

  33. Cost Accounting General Ledger Journal Voucher Journal Voucher Step 14 • Cost Accounting updates the General Ledger by using the Journal Voucher to record the Cost of Goods Manufactured. • Direct Material used • + Direct Manufacturing Labor • + Manufacturing Overhead Costs • + Work in Process (beginning) • - Work in Process (ending) • = Cost of Goods Manufactured

  34. Production Flowchart

  35. Cost Accounting General Ledger M Completed Production Order 2 Management M Step 15 Cost Accounting sends the Completed Production Order to Management.

  36. Production Flowchart

  37. Threats and Controls Threat – lack of management control during the process could cause under or over production Control – proper approval of production orders by involving management earlier on in the process(2) Control – periodic status reports to management

  38. Threats and Controls (cont) Threat – inaccurate inventory control, threat is this system only shows when raw material is being used, but it does not show when/how many completed units the company has on hand Control – inventory control department should update the general ledger by sending a journal voucher after production has been completed Control – use RFID technology to keep track of inventory Control – do a periodic physical inventory counts Control – move tickets should be used to document subsequent movement of inventory.

  39. Threats and Controls (cont) Threat – employees cheating on how many hours they actually worked Control – computerized time card system that automatically records and tightened management control procedures Control – install camera’s to monitor that employees are where they say they were Control – have manager responsible for time card accuracy from their specific department

  40. Threats and Controls (cont) Threat – time conflicts might occur between different production lines without a proper production schedule when planning production orders. Control – make the production schedule right after the production order.