An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda Each proposal has a presentation time followed by a dedicated discussion. Introductions 1st session: 2 proposals break 2nd session: 2 proposals A. Fabich Discussion/wrap-up

  2. HiRadMat - Status Adrian Fabich HiRadMat Technical Board CERN, 15th July 2014

  3. Overview • Report from HiRadMat experiments in 2012 • Shut-down work • Summary of 2014 proposals A. Fabich

  4. 2012 experiments • 9 experiments completed • On average 4 weeks between 2 experiment • Partially grouped A. Fabich

  5. 2012 - Protons to HiRadMat • Total: 1.4*1016 protons • About 48 hours of SPS cycling for HiRadMat • Preparation, waiting and extractions • Similar time span in 2011 for commissioning A. Fabich

  6. Experiments in 2012 • ​RIB target R&D • LHC transfer collimator (2x) • BLM validation • RP benchmarking • Crystal collimation PhDs completed: Juan Blanco, Nov. 2013 Nikos Charitonidis, March 2014 Beam tunneling (HRMT12) TE/MPE R. Schmidt et al. Powder target (HRMT10) C. Densham et al. A. Fabich

  7. TPSG4 - 2012 A. Fabich

  8. Shut-down work • Installation of additional cabling • Mainly for vacuum and HQ signal • Removal of experiments from • Remainders in TNC: • LPROT (HRMT12): follow-up required • TISD (HRMT01): removal delayed by availability of class-A lab • Removal of WNAF collimator blocks • Minimum advancement • lengthy preparations for and discussions with authorities A. Fabich

  9. New Proposals in 2014 • 12 applications • Named 14xx (year 2014 + running number) • Running number in the order of reception • 9 invited for presentation/discussion • 3 proposals to be discussed “offline” “placing them on the radar screen” • TPGS4 (1402): repetition with slightly higher intensity • Supra Magnet (1406): later availability • Microphone (1411): purely parasitic A. Fabich

  10. Beam parameter space A. Fabich

  11. Time frame • One experiment interested in ion operation • Half the user groups are interested in TA (Transnational Access) A. Fabich

  12. Future beam slots • 2014: 3 slots • 2015: 8(+1) slots) A. Fabich

  13. Aim of Today Review the proposals In view of • Technical feasibility • Operational • Safety • Radiation-protection • Schedule • Follow-up: Written report on the view by the HRM Technical Board • Schedule future meeting – October 2014 A. Fabich