1. Cutting stringers Bottom, top and back boards Long stringers Short stringers
2. Drilling spacers Cut spacers 7/8 inch bit Jig for drilling
3. Nailing short stringers 3 1/4 inch ring shank nails Do not nail in area to be drilled Do not nail middle board
4. Layout Access for skid steer on this side of work station Tools and equipment on this side of work station Long stringers Top boards Support beams Short stringers nailed to bottom boards Support blocks
5. Drilling boards Mark top boards Top boards Drill all the way through Long stringer Short stringer Bottom boards Back board is not drilled or nailed
6. Assembly after drilling Set top boards aside, keep in order Set re-bar all the way through and slide on spacer Toe nail spacer to short stringer Set long spacers aside
7. Final assembly Sliding top boards on, then nail all 3 to long stringers Slide long stringers on and nail to spacers
8. Nailing back board Back board to here from here Crib tipped onto front face Access for skid steer
40 workers at 6 stations made 45 cribs in 3.5 hours Tractor access from this side Tools and materials on this side Six work stations
Crib - front view Re-bar Long stringer Top boards Short stringer Back board Bottom boards Spacer
Crib– side view Top boards Long stringer Short stringer Back board Spacer Bottom boards
Crib – top view Long stringer Spacers under Top boards
Crib installed Native planting Face rock Water level Back fill Re-bar