250 likes | 431 Views
SCHOOL DISTRICT PALM BEACH COUNTY. District Design Criteria DDC. Presented By. Thomas Hogarth Victor Chodora. History. Pre-June 1, 2004: there existed design criteria for mechanical (HVAC & plumbing), electrical (power & systems), and civil.
E N D
SCHOOL DISTRICT PALM BEACH COUNTY District Design Criteria DDC
Presented By • Thomas Hogarth • Victor Chodora
History • Pre-June 1, 2004: there existed design criteria for mechanical (HVAC & plumbing), electrical (power & systems), and civil. • All three documents where in a different format. • June 1, 2004: the current DDC documents where issued, including architectural, civil, electrical, mechanical, plumbing, and structural. • All documents in the same format with and index.
History • SUMMER 2005: Planned released of updated DDC, so get your request in now.
Purpose Of Document • The document is designed to express the district requirements in construction of new schools, modernizations, additions, and renovations. • These requirements are based on past experiences but also contain incorporation of new technologies, products, and design concepts.
Sample DDC Text • 12. Golf Cart Storage/Charging Area a. Locate Golf Cart Storage/Charging Area in a location near the Central Receiving Area. b. Provide proper electrical connections for charging of carts, coordinate with Electrical Engineer. c. Provide the required ventilation for the charging of carts and or storage of flammable material, coordinate with Mechanical. Engineer. d. Locate in an area convenient to exterior and roads or sidewalks. e. Check Educational Specifications for number of charging stations and storage capacity.
Use the Index • Each document has an index. • The index is linked to the document. • If you left click with your mouse, the program will take you to that spot in the text. • http://cms.palmbeach.k12.fl.us/cms/work_file/bd/html/Criteria.htm
Documents • Architectural • Building Requirements • Outdoor Athletic and Play Fields • Site Requirements • Covered walks, signage, site design, etc • Casework/Cabinets • Materials, entry, circulation, etc • Thermal and Moisture Protection
Documents • Civil • Site Surveys and Geotechnical Reports • Site Access • Storm Water Management • Pavement Requirements • Curbs and Sidewalks • Play and Sports fields • Water Utilities
Documents • Electrical • Power Distribution System • Lighting • Switching • Receptacles • General Requirements • Electrical Systems
Documents • Mechanical • HVAC Design Criteria • What HVAC Calculations are required • Balancing and VAV Box selection requirements • Forms for Calculations, balancing, and VAV selection procedure
Documents • Plumbing • Piping Systems • Components • Specific Room Requirements • Relationship to Mechanical equipment • Fire Sprinkler System
Documents • Structural • General Structural Requirements • Threshold Buildings • Load Requirements • Concrete, Masonry, and Metals
Where to Find Documents • These documents are located on our web site along with the District Master Specifications. • Look under Building Department of Facilities Managements home page. • http://cms.palmbeach.k12.fl.us/cms/
How to Request a Change • Follow instruction in procedure for Proposed Changes to District Master Specifications. • Complete form and submit to Victor in the Building Department. • Prefer request be attached to email, chodorav@palmbeach.k12.fl.us
How to Request a Change • Submit request at any time, if substantial will issue addendum, otherwise change becomes effective next addition. • Plan is for annual updates.
Other Documents Used With Design Criteria • Educational Specifications • District Master Specifications • Building and Fire Codes
Recently Revised Procedure • Shop drawings procedure recently revised to include required product approval list. • Shop drawing matrix expanded to include additional shop drawings as well as the required product approval information. • Matrix indicates if A/E is to review and sign prior to Building Department review. • Matrix indicts which plans require signed and sealed drawings.
Other Useful Documents • Other useful Information on our web page: • Check list • Interpretations • Procedures
Home Page Bldg. Dept. Home Page
TCO Procedure • Just a reminder with summer coming and the need to open schools, we have a process for TCO along with a check list. • Copy of the check list is available on our web site. • http://cms.palmbeach.k12.fl.us/cms/work_file/bd/bin/pdf/TCOchecklist.pdf