1 / 10

APEX 2010 – Dynamic Beta* Squeeze

APEX 2010 – Dynamic Beta* Squeeze. G. Robert-Demolaize , M. Bai, , A. Marusic, S. Tepikian. Previous Experiments. The goal is to have an application similar to the one used for orbit correction at store: β * as a function of time should follow the change in emittance as “controlled” by SC.

barness
Download Presentation

APEX 2010 – Dynamic Beta* Squeeze

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX 2010–Dynamic Beta* Squeeze G. Robert-Demolaize, M. Bai, , A. Marusic, S. Tepikian

  2. Previous Experiments • The goal is to have an application similar to the one used for orbit correction at store: β* as a function of time should follow the change in emittance as “controlled” by SC. K. Mernick, RHIC Retreat, 7/1/2010

  3. APEX’09 Results • APEX time during Run10 was used to measure the effect of the Beta* squeeze algorithm when used with regular beam. This was done in parallel with M. Bai’s APEX on machine optics measurement. • For practical purposes, it was decided to perform our tests by only squeezing Beta* in one insertion (IR6 in the following). • New Beta* settings would be noticed by changes in ZDC rates, background signal, and ultimately in M. Bai’s measurements. • Strength of algorithm and limitations in online model calculations and activations had to be tested before actual application with an operating stochastic cooling system.

  4. First attempts at new Beta* • Working with the Au104 physics ramp, initial Beta* values are 0.7m at both IP6 and IP8 => try to squeeze to 0.65

  5. First attempts at new Beta* • Working with the Au104 physics ramp, initial Beta* values are 0.7m at both IP6 and IP8 => try to squeeze to 0.65

  6. First attempts at new Beta* • Working with the Au104 physics ramp, initial Beta* values are 0.7m at both IP6 and IP8 => try to squeeze to 0.65m => try 0.675m

  7. First attempts at new Beta* • Working with the Au104 physics ramp, initial Beta* values are 0.7m at both IP6 and IP8 => try to squeeze to 0.65m => try 0.675m

  8. What we learned… • Power supply limit can actually be bypassed by manually changing the ones at fault via Stepstone Editor; need to collect name from error message!!

  9. What we learned… • Power supply limit can actually be bypassed by manually changing the ones at fault via Stepstone Editor; need to collect name from error message!! • Noticeable impact on experimental background and ZDC rates:

  10. Plans for Run11 • Test the online model further to assess: • time constraints depending on squeezing steps; • robustness of script when PS limits are reached. • Main goal: use the effect of SC on emittance changes along a store to increase luminosity by dynamically reducing β* (i.e. keep the ratio ε/β* constant). • This can be done in stages: first a step function, then a fitted exponential (once SC is fully commissioned).

More Related